13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

9.0 IDENTIFICATION OF CONTRACTOR'S EMPLOYEES ,VEHICLES AND BUILDINGSThe Contractor shall provide each of 'his employees and his Subcontractor'semployees with a suitable numbered badge bearing the name or initials of theContractor. Each employee shall wear his badge upon his person while at work onthe Site in such a manner that it will be plainly visible as a means of identification.All vehicles and large equipment furnished and used by the Contractor or hisSubcontractors on the Work shall be clearly marked with the Contractor's orSubcontractor's business name. The Contractor's offices, stores, depots and otherfacilities shall also be clearly identified.10.0 EXPATRIATE PERSONNELThe Contractor shall submit to the Board through the Engineer data on allpersonnel he intends to bring into Bangladesh <strong>for</strong> the per<strong>for</strong>mance of the Work.This data shall include the name and present address of each person, his intendedassignment and responsibility in connection with the Work and a concise resume ofhis experience in the type of work to which he will be assigned. This data shall besubmitted to the Engineer at least thirty (30) days prior to their expected arrival inBangladesh.Any expense associated with illness of the Contractor's personnel, includingreplacement thereof, shall be to the Contractor's account.Costs of passports, visas, travel <strong>document</strong>s, inoculations and other incidentalexpenses incurred by the Contractor's non-Bangladesh employees and theirdependants occasioned by travel to and from Bangladesh shall be borne by theContractor.The Board will not furnish living quarters <strong>for</strong> the Contractor's personnel andfamilies.The Contractor and the expatriate personnel of the Contractor shall respect allBangladesh laws, rules and regulations and shall not interfere with Bangladeshpolitical or religious affairs either directly or indirectly and shall comply with suchother rules and regulations.11.0 SAFETYThe Contractor shall comply with all ordinances and regulations including, but notlimited to, National, State, Municipal laws and Department of Labour,Transmigration and Co-operation Regulations that are in <strong>for</strong>ce in the locality of theWorks and shall comply with any instructions that may be from time to time issuedby the Board/Engineer.12.0 PROTECTION OF OPERATING PLANTThe Contractor's attention is drawn to the fact that during the course of theconstruction period, existing Gopalgonj 132 KV Grid Sub-Station and relatedtransmission/auxiliary system are under operation.The Contractor shall not interrupt or interfere with these services.112

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!