13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

the practical arrangements he is offering <strong>for</strong> ensuring the training, as well as themethodology used.The Contractor will provide all maintenance and operation manual, drawingsrelating to all the equipment to each trainee on the first day of his arrival at theContractor's Works.(2) Job Site TrainingThe <strong>BPDB</strong> shall make available, free of cost, to the Contractor the suitable numberof staff member <strong>for</strong> the purpose of on-the-job training at site during installation,testing, commissioning and initial operation of the plant <strong>for</strong> one (1) month. Duringwarranty period, it shall be the responsibility of the Contractor to train themadequately and properly in a planned manner so that these member of the Board'sstaff could take over the responsibility of operation and maintenance of the plantand equipment independenly at the time of handing over of such plant andequipment as well as be<strong>for</strong>e issuing of FAC.(3) Operation & Maintenance During Warranty PeriodThe Contractor shall provide One (1) Competent Engineer who will supervise theoperation of the plant and be in overall charge of the Plant, one (1) Engineer <strong>for</strong>Electrical Maintenance & one (1) Engineer Mechanical Maintenance during 24months warranty period <strong>for</strong> smooth maintenance and operation of the Plant.During warranty period the above mentioned Engineers jointly with <strong>BPDB</strong>'SEngineers/Staff shall have to per<strong>for</strong>m the operation & maintenance of the plantwhich will ensure the operation and maintenance of the plant after the warrantyperiod by <strong>BPDB</strong> personnel exclusively. For this purpose, quarterly progress report of<strong>BPDB</strong> Personnel shall have to be submitted to the authority by the abovementioned Engineers showing the progress of <strong>BPDB</strong> Personnel <strong>for</strong> safe & reliableoperation and maintenance of the plant independently.71.0 MODIFICATIONSThe contractor shall not alter any of the Work, except as directed in writing by theBoard through he Engineer, but the Engineer will assist the Board subject to theprovisions hereinafter contained from time to time during the execution of theContract by notice in writing to direct the Contractor to alter, amends, omit, add to,or otherwise vary any of the works, and the Contractor shall carry out suchvariation, and be bound by the same conditions, so far as applicable, as though thesaid variations were stated in the Specifications. In any case in which theContractor has received any such direction from the Board through the Engineerwhich either then or later will, in the opinion of the Contractor, involve an increaseor decrease in the Contract Price, the Contractor shall as soon as reasonablypossible, advise the Engineer in writing to that effect.The difference in cost to the Board, if any, occasioned by any such variations, shallbe added to or deducted from the Contract Price as the case may require. Theamount of such difference shall be ascertained and determined in accordance withthe rates specified in Schedule of Prices, so far as the same may be applicable, andwhere are not contained in the said Schedule or are not applicable, such amountshall be agreed between Board and the Contractor.103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!