13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

64.0 BOOKS AND RECORDSThe Contractor shall maintain books and records covering all transactions underthis Contract. These books and records shall be available <strong>for</strong> inspection and auditby the Board <strong>for</strong> a period of three (3) years after termination as provided under theContract.65.0 PACKAGINGAll equipment and materials shall be suitably coated wrapped, or covered andboxed or crated <strong>for</strong> export shipment and to prevent damage during handling andstorage at the Site. Card<strong>board</strong> containers shall be enclosed in a solid woodencontainer.Equipment and process materials shall be packed and semi-kocked down, to theextent possible, to facilitate handling and storage and to protect bearings and othermachine surfaces from oxidation. Each container, box, crate or bundle shall berein<strong>for</strong>ced with steel strapping in such a manner that breaking of one strap will notcause complete failure of the packaging. The packing shall be of best standard towithstand rough handling and to provide suitable protection from tropical weatherwhile in transit and while awaiting erection at the Site.Equipment and materials in wooden cases or crates shall be properly cushioned towithstand the abuse of handling, transportation and storage. Packing shall includepreservatives suitable to tropical conditions. All machine surfaces and bearingsshall be coated with oxidation preventative compounds. All parts subject todamage when in contact with water shall be coated with a suitable grease andwrapped in heavy asphalt or tar impregnated paper.Crates and packing material used <strong>for</strong> shipping will become the property of theBoard, but the Contractor will be allowed to use the same <strong>for</strong> the Work as needed,but the remaining material shall be turned over to the Board upon completion ofthe Project.Packaging or shipping units shall be designed within the limitations of the unloadingfacilities of the receiving ports and the ship which will be used. Ships with specialheavy capacity unloading rigging may be required <strong>for</strong> large units of equipment. Itshall be the Contractor's responsibility to investigate these limitations and toprovide suitable packaging and shipping to permit unloading at the Port.Each package or shipping unit shall be clearly marked or stencilled on at least twosides as follows :BANGLADESH POWER DEVELOPMENT BOARDGOPALGANJ100 MW±15 % POWER PLANT(HFO FIRED ENGINE GENERATING SETS) PROJECTBANGLADESH____________________________________________________(Name of Contractor)In addition, each package or shipping unit shall have the symbol painted in red onat least two sides of the package, covering one fourth of he area of the side.100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!