13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Specifications of the equipment/materials offered and fulfilment of key dates shallbe the essence <strong>for</strong> selection of qualified <strong>tender</strong>ers.Total time from Contract Effective Dateto Completion of ICO of the unit- Shall not exceed 450 daysGuarantee data have to be furnished with technical proposal as stated in guaranteeschedule-A, vol. 3 of 3 of <strong>tender</strong> <strong>document</strong>. The Tender shall be rejected if theTenderers do not comply this requirement.Data given by the Tenderer which significantly affect the result of evaluation shallbe included in the Contract as requirements to be guaranteed and will be subject toverification at the cost of the Tenderer and to the satisfaction of the BOARD.Proposal which offers less than 85 MW capacity (Net output at site condition) ofPower Plant as specified in Technical Requirements will not be accepted. ExcessNet output more than 115 MW at site conditions shall not be considered <strong>for</strong>evaluation of per KW cost stated hereunder.The evaluation will take into account both Tender Price and annual operating &maintenance cost. Initial cost of the proposals shall be determined by bringing thescope of works of all the proposals to a common basis (loading of omitted itemsprice from the highest quoted price of other Tenderer). The BOARD reserves theright to judge the reasonableness of the cost components quoted by the Tendererswith regard to maintenance cost per year and overhaul cost as enumerated below:Financial Analysis:(i) The evaluation of the proposal would be done by Financial analysis method taking intoaccount the following.a) First/ Initial cost.b) Annual operating and maintenance cost of the plantc) Fuel costd) Step-up trans<strong>for</strong>mer losses (no load and load loss)e) Commissioning timeFor the purpose of evaluation all costs shall be based on current prices asof the date of the Tender closing.(ii) Monetization <strong>for</strong> early or late commissioning: Not applicable(iii) Basis of Financial analysis:For the purpose of Financial analysis, the following data would be considered:a. Plant life - 15 yearsb. Plant will operate on HFOc. plant will operate at 30% Plant factor23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!