19.0 FIRE PROTECTIONOnly construction procedures which minimise fire hazard to the extent practicableshall be used. Combustible debris and waste materials shall be collected andburned or removed from the Site each day, good housekeeping shall be practisedby the Contractor throughout the construction period. Unless specified herein or aparticular application, untreated canvas, paper, plastic and other flammable flexiblematerials shall not be used on the Site <strong>for</strong> any purpose. If such materials are onequipment or materials which arrive at the Site they shall be removed and replacedwith an approved covering be<strong>for</strong>e storing or moving into the construction area.Likewise corrugated paper and fiber<strong>board</strong> cartons shall not be permitted in theconstruction area <strong>for</strong> the storage or handling of materials and if such cartons doarrive in the construction area they shall be immediately unpacked and removedfrom the Site.Approved flexible materials shall be waterproof and flame resistant.The Contractor shall provide adequate fire protection equipment in each warehouseoffice and other temporary structure and in each work area which he is occupying.Access to fire hydrants and other sources of fire water shall be identified and keptopen at all times. Suitable fire extinguishers shall be provided in enclosed area andin areas which are not accessible to fire water or which may be exposed to fire thatcannot be safely extinguished with water. Each fire extinguisher shall be of a typesuitable <strong>for</strong> extinguishing fires which might occur in the area in which it is located.In areas where more than one type of fire might occur the type of fire extinguisherrequired in each case shall be provided. Each extinguisher shall be placed in aconvenient, clearly identified location which will most likely be accessible in theevent of fire. Formwork, scaffolding, planking and similar materials which arecombustible but which are essential to execution of the Work shall be treated <strong>for</strong>fire resistance or otherwise protected against combustion resulting from weldingsparks cutting flames and similar fire sources.The above recommendations shall not be construed to establish minimum fireprotection requirements. The Contractor alone shall be responsible <strong>for</strong> providingadequate fire protection.20.0 LINES AND GRADESAll work done under this Contract shall be done to the lines, grades, and elevationsshown on the plans. The Contractor shall furnish competent men and suitableequipment as required <strong>for</strong> the proper laying out of the Work, <strong>for</strong> makingmeasurements and <strong>for</strong> establishing temporary or permanent marks in connectionwith the Work.The Engineer may, at his sole discretion, check the ref erence marks, lines, gradesand measurements so established. The Contractor shall furnish competent menfrom his <strong>for</strong>ce and such tools, stakes and other materials as the Engineer mayrequire in making the check. The Contractor shall keep the Engineer in<strong>for</strong>med areasonable time in advance, of the times and places at which he wishes to do workso that any checking deemed necessary may be made with the minimum ofinconvenience to the Engineer and of delay to the Contractor.115

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!