13.07.2015 Views

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

bangladesh power development board tender document for ... - BPDB

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

xiv)xv)xvi)xvii)xviii)xix)xx)xxi)xxii)xxiii)xxiv)xxv)xxvi)"Engineer's Representative" shall mean the Resident Engineer appointed bythe Engineer to be stationed at the Site and to represent the Engineer in allmatters."Contract Price" shall mean the sum or all sums named in the ContractAgreement."Site" means the <strong>power</strong> house grounds and buildings and the surroundingareas where the Work is to be carried on."Day" or "Days", unless herein otherwise expressly defined, shall mean acalendar day or days of twenty-four hours each."Specifications" shall mean and include the General Conditions, SpecialConditions, Technical Requirements and Tender Forms which are part of theContract Documents; and all standard specifications of any technical society,organisation, or association to which reference is made.'Drawings" shall mean and include all (a) drawings furnished by the Board aspart of this Contract, (b) all supplementary drawings furnished by the Boardas and when required to clear, and to define in greater detail, the intent ofthe Contract Plans and Specifications, and (c) drawings submitted by theContractor to the Board, when and as approved by the Engineer.'Tests on completion" shall mean such tests to be made by the Contractorbe<strong>for</strong>e the Works are taken over by the Board as are provided <strong>for</strong> in theContract and such other tests as may be agreed between the Board/Engineerand the Contractor."Taking Over" shall signify that fabrication, construction, tests. inspectionsand adjustment has been satisfactorily completed."Warranty Period" shall mean the period of 2(two) years following Takingover during which the Contractor guarantees the Plant and equipmentagainst defects in design, materials, construction and workmanship.“Final Acceptance Certificate" shall mean the official notification by the Boardto the Contractor, issued at the end of the warranty period which indicatesthat the Contractor has completed his obligation under the Contract."Payment Certificate" shall mean a certificate issued by the concerned ProjectDirector or a person designated by the Board that the monies claimed on theContractor's invoice are correct and that the claim <strong>for</strong> payment is justifiedunder the terms of the Contract."Completion Certificate" shall mean a certificate issued by the Board, andsigned by the Board and confirmed by the Engineer confirming the Takingoverof the Plant."Award", "Acceptance' or "Letter of Intent' shall mean the official noticeissued by the Board notifying the successful Tenderer that his <strong>tender</strong> has67

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!