On September 1, <strong>2010</strong>, the French Energy Ministry approved<br />
a new decree on remuneration for photovoltaic systems,<br />
which replaces that approved on January 14, <strong>2010</strong>.<br />
As of September 1, the following rates apply:<br />
> €580/MWh for systems integrated into residential<br />
buildings of less than 3 kWc;<br />
> €510/MWh for systems integrated into residential<br />
buildings of more than 3 kWc and into hospitals and<br />
schools;<br />
> €440/MWh for systems integrated into other types of<br />
buildings;<br />
> €370/MWh for simplified-integration systems;<br />
> for systems installed on the ground, the remuneration<br />
depends on the location of the systems, since it is based<br />
on the product of €276/MWh and an “R” location coefficient.<br />
These rates remain unchanged for plants in operation<br />
from 2011 and will be cut by 10% per year for plants that<br />
enter into operation starting from 2012.<br />
On December 10, <strong>2010</strong>, a new decree for the photovoltaic<br />
sector was published. It suspends new applications for the<br />
feed-in tariff for three months. The only exceptions are as<br />
follows: plants of less than 3 kWc; plants whose technical<br />
and financial connection plan (PTF) had been accepted<br />
nine months before publication of the decree, or before<br />
December 2, <strong>2010</strong>, with start of generation within 18<br />
months of the acceptance of the PTF. The suspended applications<br />
must be resubmitted to obtain the feed-in rates,<br />
which in the meantime are to be redefined in a new decree.<br />
Renewal of hydroelectric concessions<br />
On April 22, <strong>2010</strong> the Ministry of Energy issued a notice<br />
concerning the renewal of hydroelectric concessions expiring<br />
in the <strong>com</strong>ing years. The notice sets out the procedure<br />
and the schedule for renewals, as well as the scope of<br />
the concessions. The term of the new concessions and the<br />
ceiling on royalties have yet to be determined.<br />
The first round of concession renewals was to have begun<br />
at the end of <strong>2010</strong> and last until mid-2012. There<br />
is currently a 6-month delay <strong>com</strong>pared with the calendar<br />
initially established by the Ministry. The concessions<br />
involved in this first stage are located in the Alps, the<br />
Massif Central and the Pyrenees, with a total capacity of<br />
about 5,300 MW.<br />
Article 35 of the “Grenelle 2” Act (now before Parliament<br />
for approval) will set out the framework for royalties for<br />
the renewal of the hydroelectric concessions.<br />
66 <strong>Enel</strong> <strong>Annual</strong> <strong>Report</strong> <strong>2010</strong> <strong>Report</strong> on operations<br />
Grenelle de l’Environnement<br />
On May 11, <strong>2010</strong> the National Assembly approved the<br />
“Grenelle 2” Act, which will implement the provisions of<br />
the Grenelle de l’Environnement Act. The law had been approved<br />
by the Senate on October 8, 2009. As the measure<br />
had been declared urgent, the text did not go through a<br />
second reading in the two houses. Instead, it was submitted<br />
to the Commission Mixte Paritaire (CMP, <strong>com</strong>posed of<br />
7 deputies and 7 senators) established on June 17, <strong>2010</strong><br />
to draft a definitive <strong>com</strong>promise text for final approval by<br />
Parliament. The CMP held its final vote on “Grenelle 2” on<br />
June 28, <strong>2010</strong> and the text was officially published on July<br />
13, <strong>2010</strong>.<br />
Some of the changes introduced with “Grenelle 2” have<br />
a direct impact on the energy sector. In addition to extending<br />
the benefits of the obligation d’achat to local<br />
authorities, “Grenelle 2” also introduces a regional planning<br />
system for the climate and energy that also provides<br />
for the preparation of regional plans for the connection<br />
of renewable resources to the network (with priority for<br />
a period of ten years for the renewables capacity set out<br />
in the regional plan). The law also governs the payments<br />
to be made at the time hydroelectric concessions are renewed:<br />
royalties will be specific to each concession and<br />
will depend on the value of plant output (with a specific<br />
ceiling for each plant); the revenues from royalties will be<br />
divided among the State, the provinces and the municipalities<br />
in the proportion of 1/2, 1/3 and 1/6, respectively.<br />
Finally, the rules for authorization of wind projects were<br />
tightened: a regional plan for wind development will redefine<br />
the ZDEs (Zones de Développement Eolien) for each<br />
territory; plants must have a minimum of 5 turbines (with<br />
the exception of plants less than 30 meters tall and a capacity<br />
of less than 250 kW) and be located at least 500<br />
meters from inhabited areas. In addition, wind plants with<br />
structures more than 50 meters tall are required to <strong>com</strong>ply<br />
with the ICPE, a more <strong>com</strong>plex procedure for plants with a<br />
larger potential environmental impact.<br />
Renewable energy support law<br />
In December <strong>2010</strong>, the Ministry of Energy, using the auction<br />
mechanisms envisaged for installations in the electricity<br />
sector set out in Law 2000-108 of February 10, 2000,<br />
launched two auctions for wind and biomass power. Tenders<br />
for the biomass auction must be submitted by the<br />
end of February 2011, while for the wind auction the Ministry<br />
defined the zones covered (Corsica and the French<br />
Antilles) and set May 2011 as the deadline for tenders.