18.01.2013 Views

Enabling Processes

Enabling Processes

Enabling Processes

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHAPTER 5<br />

COBIT 5 PROCESS REFERENCE GUIDE CONTENTS<br />

BAI03 Process Practices, Inputs/Outputs and Activities<br />

Management Practice Inputs Outputs<br />

BAI03.01 Design high-level solutions.<br />

From Description Description To<br />

Develop and document high-level designs using<br />

agreed-on and appropriate phased or rapid agile<br />

development techniques. Ensure alignment with the<br />

APO03.01<br />

APO03.02<br />

Architecture principles<br />

Baseline domain<br />

Approved high-level<br />

design specification<br />

BAI04.03<br />

BAI05.01<br />

IT strategy and enterprise architecture. Reassess and<br />

descriptions and<br />

update the designs when significant issues occur during<br />

architecture definition<br />

detailed design or building phases or as the solution<br />

evolves. Ensure that stakeholders actively participate in<br />

the design and approve each version.<br />

APO04.03 Research analyses of<br />

innovation possibilities<br />

APO04.04 Evaluations of innovation<br />

ideas<br />

BAI02.01 � ��������� ����������<br />

criteria from<br />

stakeholders<br />

� ������������ ����������<br />

repository<br />

BAI02.02 ���������� ������������<br />

development plan<br />

Activities<br />

1. Establish a high-level design specification that translates the proposed solution into business processes, supporting services, applications,<br />

infrastructure, and information repositories capable of meeting business and enterprise architecture requirements.<br />

2. Involve appropriately qualified and experienced users and IT specialists in the design process to make sure that the design provides a solution that<br />

optimally uses the proposed IT capabilities to enhance the business process.<br />

�� ������ � ������ ���� �� ��������� ���� ��� �������������� ������ ���������� �� � ����� �� ������ ���� �� ����������� ��� ��� �������� ��� �����������<br />

method and consistent with business, enterprise and IT strategies, the enterprise architecture, security plan, and applicable laws, regulations<br />

and contracts.<br />

�� ����� ������� ��������� ��������� ������ ��� ����� ���������� ������ �� ��� ������� ������������ ��� ��� ���������������� ������� ������ ��� ��������<br />

����� �� ��������� ��������� ���� ������ ���� ������ ���������� ��� ������� �� ������������� ������<br />

Management Practice Inputs Outputs<br />

BAI03.02 Design detailed solution components.<br />

From Description Description To<br />

Develop, document and elaborate detailed designs<br />

progressively using agreed-on and appropriate phased<br />

or rapid agile development techniques, addressing all<br />

APO03.01 Architecture principles Approved detailed<br />

design specification<br />

BAI04.03<br />

BAI05.01<br />

components (business processes and related automated APO03.02 � ����������� ������������ SLAs and OLAs BAI04.02<br />

and manual controls, supporting IT applications,<br />

model<br />

infrastructure services and technology products, and<br />

� �������� ������<br />

�������������������� ������ ���� ��� �������� ������<br />

descriptions and<br />

includes internal and external SLAs and OLAs.<br />

architecture definition<br />

APO03.05 Solution development<br />

guidance<br />

APO04.06 Assessments of using<br />

innovative approaches<br />

BAI02.01 � ��������� ����������<br />

criteria from<br />

stakeholders<br />

� ������������ ����������<br />

repository<br />

BAI02.02 Feasibility study report<br />

BAI02.03 � ���� ���������� �������<br />

� ������������ ����<br />

register<br />

BAI02.04 Sponsor approvals<br />

of requirements and<br />

proposed solutions<br />

Personal Copy of: Mr. Dong Hong Wang<br />

135<br />

Build, Acquire and Implement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!