18.01.2013 Views

Enabling Processes

Enabling Processes

Enabling Processes

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHAPTER 5<br />

COBIT 5 PROCESS REFERENCE GUIDE CONTENTS<br />

APO03 Process Practices, Inputs/Outputs and Activities (cont.)<br />

APO03.01 Activities<br />

�� �������� ��� ��� ������������ ��� ����� �������������������� ��� ������ ��� ��� ���������� ������������ �� �� ��������� �� ���� �� ��� ������������<br />

views to be developed to satisfy the various stakeholder requirements.<br />

2. Identify the enterprise goals and strategic drivers of the enterprise and define the constraints that must be dealt with, including enterprisewide<br />

����������� ��� ���������������� ����������� ������ ��������� ���������� ������<br />

�� ����� ������������ ���������� ���� ��������� ��������� �����������<br />

4. Understand the capabilities and desires of the business, then identify options to realise those capabilities.<br />

�� ������ ��� ������������ ��������� ��� �������<br />

6. Define what is inside and what is outside the scope of the baseline architecture and target architecture efforts, understanding that the baseline and<br />

target need not be described at the same level of detail.<br />

7. Confirm and elaborate architecture principles, including enterprise principles. Ensure that any existing definitions are current and clarify any areas<br />

of ambiguity.<br />

�� ���������� ��� ������� ���������� ��������� ����� ��� ���������� ��� ���� ���� ��� ��������� �������� ������� �� ������ ���� ���������� ����������<br />

architecture opportunities are leveraged in the development of the strategic plan.<br />

9. Based on stakeholder concerns, business capability requirements, scope, constraints and principles, create the architecture vision: a high-level view<br />

of the baseline and target architectures.<br />

10. Define the target architecture value propositions, goals and metrics.<br />

11. Identify the enterprise change risk associated with the architecture vision, assess the initial level of risk (e.g., critical, marginal or negligible) and<br />

develop a mitigation strategy for each significant risk.<br />

��� ������� �� ���������� ������������ ������� �������� ����� ������� ����� ��� ��������� �� ������������ ����� ��� ������ �������� �� �������� � �������<br />

aligned and integrated with the enterprise strategy.<br />

Management Practice Inputs Outputs<br />

APO03.02 Define reference architecture.<br />

From Description Description To<br />

The reference architecture describes the current and<br />

APO01.01 � ���������� ����������� Baseline domain APO13.02<br />

target architectures for the business, information, data,<br />

guidelines<br />

descriptions and BAI02.01<br />

application and technology domains.<br />

� ���������� ��<br />

architecture definition BAI03.01<br />

organisational structure<br />

BAI03.02<br />

and functions<br />

APO01.05 � ������� ����������� Process architecture model APO01.01<br />

placement of IT function<br />

� ���������� �� ������� ���<br />

IT organisation<br />

APO01.06 Data classification<br />

guidelines<br />

Outside COBIT Enterprise strategy<br />

Personal Copy of: Mr. Dong Hong Wang<br />

Information architecture<br />

model<br />

APO02.05<br />

BAI02.01<br />

BAI03.02<br />

DSS05.03<br />

DSS05.04<br />

DSS05.06<br />

65<br />

Align, Plan and Organise

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!