14.02.2013 Views

TREBLINKA: - Holocaust Handbooks

TREBLINKA: - Holocaust Handbooks

TREBLINKA: - Holocaust Handbooks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter IV: The Alleged Extermination Facilities in Treblinka 113<br />

scope of the work of the SS Administrator was subdivided into five groups, of<br />

which Group C – Construction bore the responsibility for construction.<br />

Finally, four SS and Police Chiefs, one for each district: Warsaw (Arpad<br />

Wigand), Lublin (Odilo Globocnik), Radom (Carl-Albrecht Oberg), and Lemberg<br />

(Fritz Katzmann) were under the Senior SS and Police Chief in the General<br />

Gouvernement.<br />

In November 1941, Amt II “Bauten” (Bureau II “Buildings”) of the Hauptamt<br />

Haushalt und Bauten (HHB, Main Office Budget and Buildings) encompassed<br />

seven construction inspection units of the Waffen-SS and Police with<br />

the Senior SS and Police Chiefs. The jurisdiction over the General Gouvernement,<br />

upon whose territory the camps of Be��ec, Sobibór, and Treblinka were<br />

situated, was exercised by the Bauinspektion der Waffen-SS und Polizei Reich<br />

Generalgouvernement (Construction Inspection of the Waffen-SS and Police<br />

Reich General Gouvernement), which was composed of five Zentralbauleitungen<br />

(Central Construction Offices) with nine Construction Offices of the<br />

Waffen-SS and Police. The Construction Inspection Office had its seat in<br />

Krakow, while the Central Construction Offices were located in Krakow,<br />

Warsaw, Lublin, D�bica, and Lemberg (the last belonged administratively to<br />

the General Gouvernement). 282 The Central Construction Office of the Waffen-SS<br />

and Police at Warsaw was thus subject to both the Construction Inspection<br />

Office of the Waffen-SS and Police Reich General Gouvernement<br />

and also to the SS Administrator at the Senior SS and Police Chief in the General<br />

Gouvernement.<br />

All construction work carried out in the General Gouvernement in the year<br />

1942 followed normal bureaucratic practice, which appears to be as follows:<br />

instructions from the Department Group C “Constructions” of the SS WVHA,<br />

in correspondence with the directives of Reichsminister Speer, went through<br />

the SS Administrator to the Central Construction Offices and Construction<br />

Units, which were in charge with accomplishing the actual constructions.<br />

Insofar as Treblinka was concerned, this practice is fully confirmed by the<br />

single known document dealing with the construction of the camp. It is a work<br />

certificate for June 1, 1942, about which the Polish judge Z. �ukaszkiewicz<br />

reports the following: 283<br />

“The witness Lucjan Pucha�a, railway technician, has produced a very<br />

interesting document: a certification to begin work from the Central Construction<br />

Office of the Waffen-SS and Police, issued on June 1, 1942. According<br />

to the information in it, on this day the construction of a spur line,<br />

which was supposed to lead from the branch line to the camp, was delegated<br />

to him. This certificate is valid until the 15th of June 1942, [284] and<br />

282 WAPL, 3, pp. 12, 24.<br />

283 USSR-344. GARF, 7445-2-126, p. 320 (p. 3 of the report).<br />

284 In the text “1945” appears by error.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!