BIDER, I., JOHANNESSON, P. Tutorial on: Mo<strong>de</strong>ling Dynamics of Business Processes –Key for Building Next Generation of Business Information Systems. In: THE 21stINTERNATIONAL CONFERENCE ON CONCEPTUAL MODELING - ER2002, 2002.Proceedings..., Tampere, FL: [s.n.], 2002, p. 7-11.BOEHM, B. W. Software Risk Management. 1 ed., Washington: IEEE Computer SocietyPress, 1989.BOOCH, G., JACOBSON, I., RUMBAUGH, J. The Unified Mo<strong>de</strong>ling LanguageReference Manual. 1 ed., Addison-Wesley, 1999.BPMI. Business Process Management Initiative. http://www.bpmi.org, Consultado naInternet em: 20/05/2010.BPMN. Business Process Mo<strong>de</strong>ling Notation. http://www.bpmn.org, Consultado naInternet em: 20/05/2010a.BPMN. Business Process Mo<strong>de</strong>ling Notation. http://www.omg.org/spec/BPMN/1.2,Consultado na Internet em: 20/05/2010b.BRG. GUIDE Business Rules Project. Final Report, Revisão 1.2, Oct, 1997,http://www.businessrulesgroup.org. Consultado na Internet em: 20/05/2010.BUBENKO JR., J. A., KIRIKOVA, M. Enterprise mo<strong>de</strong>lling: improving the quality ofrequirements specification. In: IRIS-17 <strong>INF</strong>ORMATION SYSTEMS RESEARCHSEMINAR IN SCANDINAVA, 1994. Proceedings..., Oulu: [s.n.], 1994.BUBENKO JR, J. A., STIRNA, J., BRASH, D. EKD user gui<strong>de</strong>. Royal Institute ofTechnology, Dpt of computer and systems sciences, Stockholm, 1998.BUBENKO JR, J. A., WANGLER, B. Objectives driven capture of business rules andinformation systems requirements. In: INTERNATIONAL CONFERENCE ONSYSTEMS, MAN AND CYBERNETICS, 1993. Proceedings..., Le Touquet: [s.n.], 1993,p. 670-677.CANÓS, J. H., PENADÉS, M. C., CARSÍ, J. A. From Software Processes to WorkflowProcesses: the Workflow Lifecycle, In: INTERNATIONAL SOFTWARETECHNOLOGY WORKSHOP, 1999. Proceedings..., Grenoble: [s.n.], 1999.CASTRO, J. F. B. Introdução a Engenharia <strong>de</strong> Requisitos. In: JORNADA DEATUALIZAÇÃO EM <strong>INF</strong>ORMÁTICA DO XIV CONGRESSO DA SOCIEDADEBRASILEIRA DE COMPUTAÇÃO, 1995. Proceedings..., Canela: SBC, 1995.96
CASTRO, J. F. B., ALENCAR, F. M. R., SANTANDER, V. F. A., LOURENÇO, C. T. L.Integration of i* and Object Oriented Mo<strong>de</strong>ls. In: YU, E., MYLOPOULOS, J.,MAIDEN, N., GIORGINI, P., Social Mo<strong>de</strong>lling for Requirements Engineering.Cambridge, MA: MIT Press, 2010.CASTRO, J. F. B., KOLP, M., MYLOPOULOS, J. Towards Requirements-DrivenInformation Systems Engineering: The Tropos Project, Information Systems, Elsevier,Amsterdam, The Netherlands, 2002.CHICHINELLI, M. Contribuição da Técnica <strong>de</strong> Mo<strong>de</strong>lagem <strong>Organizacional</strong> I* aoProcesso <strong>de</strong> Engenharia <strong>de</strong> Requisitos, com <strong>de</strong>staque aos Requisitos Não Funcionais.Dissertação (Dissertação <strong>de</strong> Mestrado) – Engenharia <strong>de</strong> Software – Universida<strong>de</strong> <strong>de</strong>São Paulo, São Carlos, SP, 2002. Dissertação.CHUNG, L., NIXON, B. A., YU, E., MYLOPOULOS, J. Non-Functional Requirements inSoftware Engineering. Software Engineering – Kluwer Aca<strong>de</strong>mic Publishers. 2000.Monografia.CONRADI, R., BASILI, V., CARVER, J., SHULL, F., TRAVASSOS, G. A PragmaticDocument Standards for and Experience Library: Roles, Documents, Contents, andStructure. University of Maryland, April 2001, Technical Report CS-TR-4235.CRUZ NETO, G. G. Estudos qualitativos para elicitação <strong>de</strong> requisitos: uma abordagemque integra análise sócio-cultural e mo<strong>de</strong>lagem organizacional. Tese (Tese <strong>de</strong>Doutorado) – Engenharia <strong>de</strong> Software – Universida<strong>de</strong> Fe<strong>de</strong>ral <strong>de</strong> Pernambuco, Recife,PE, 2008.DAVIS, A M. Software Requirements: Objects, Functions, and States. New Jersey: P T RPrentice Hall, Englewood Cliffs, 1993.DUARTE, M. A. Workflow – Fluxo <strong>de</strong> Trabalho,http://www.catalao.ufg.br/cc/disc/ti/wfl_aula.pdf, Consultado na Internet em:15/06/2010.DUMAS, M., AALST, W. M. P., HOFSTEDE, A. H. Process-Aware Information Systems:Bridging People and Software Through Process Technology. Wiley-Interscience,2005.ERIKSSON, H. E., PENKER, M. Business Mo<strong>de</strong>ling With UML. New York: John Wiley& Sons, 2000.97
- Page 2 and 3:
FERNANDO LUIZ GRANDOAVALIANDO TÉCN
- Page 4 and 5:
DEDICATÓRIAAos meus pais e minha i
- Page 6 and 7:
AGRADECIMENTOSA Deus, pela saúde e
- Page 8 and 9:
3.24: Notações básicas para Caso
- Page 10 and 11:
Lista de Abreviaturas e SiglasB2BBP
- Page 12 and 13:
SumárioLista de Figuras ..........
- Page 14 and 15:
ResumoHoje em dia, o desenvolviment
- Page 16 and 17:
conjunto estruturado de atividades
- Page 18 and 19:
forma de satisfação de objetivos,
- Page 20 and 21:
será inserido não foi modelado e
- Page 22 and 23:
Já no Capítulo 4 o estudo compara
- Page 24 and 25:
Uma incorreta identificação de re
- Page 26 and 27:
a) Requisitos Funcionais (RF): são
- Page 28 and 29:
Kotonya e Sommerville (1998) descre
- Page 30 and 31:
Já Alencar (1999), propõe diretri
- Page 32 and 33:
Informações mais completas a resp
- Page 34 and 35:
confirmar teorias ou validar medida
- Page 36 and 37:
Sendo o GQM orientado a objetivos o
- Page 38 and 39:
No próximo capítulo são apresent
- Page 40 and 41:
Essa análise deve ser conduzida an
- Page 42 and 43:
Nas seções seguintes, serão apre
- Page 44 and 45:
Figura 3.2: Parte de um MO de uma B
- Page 46 and 47:
a) Entidade: é alguma coisa do dom
- Page 48 and 49:
componentes do Modelo de Objetivos;
- Page 50 and 51:
Figura 3.7: Exemplo de parte de um
- Page 52 and 53:
mesmo tempo seja capaz de lidar com
- Page 54 and 55:
Swimlanes (raias) (Tabela 3.3): fun
- Page 56 and 57:
Um exemplo de segmento de processo
- Page 58 and 59:
3.4 A Técnica i*A técnica i*, pro
- Page 60 and 61: Na dependência de tarefa, o Depend
- Page 62 and 63: 3.4.2 O Modelo de Razões Estratég
- Page 64 and 65: observa nas dependências do tipo o
- Page 66 and 67: Os principais elementos do modelo s
- Page 68 and 69: egras refletem políticas do negóc
- Page 70 and 71: IFTHENELSE(sinistro é assegurado p
- Page 72 and 73: alcançar o objetivo-alvo “Realiz
- Page 74 and 75: A especificação de um caso de uso
- Page 76 and 77: Analisando brevemente algumas das t
- Page 78 and 79: Capítulo 4Estudo Comparativo e Ava
- Page 80 and 81: Figura 4.1: Ciclo de vida de projet
- Page 82 and 83: solução: desenvolver um sistema d
- Page 84 and 85: M09: As respostas coletadas de um g
- Page 86 and 87: Figura 4.2: Diagrama BPMN para o m
- Page 88 and 89: Figura 4.4: Diagrama SR para o mód
- Page 90 and 91: Figura 4.6: Diagrama SR para o mód
- Page 92 and 93: Regra de Negócio 04: REALIZAR PEDI
- Page 94 and 95: Figura 4.9: Diagrama de Casos de Us
- Page 96 and 97: No Modelo de Conceitos podem ser vi
- Page 98 and 99: formuladas, com o intuito de fornec
- Page 100 and 101: possibilitando também a divisão d
- Page 102 and 103: sendo inserido. Kaabi, Souveyet e R
- Page 104 and 105: Para o estudo comparativo foi utili
- Page 106 and 107: Capítulo 5Considerações FinaisAp
- Page 108 and 109: de Uso de Negócio não consegue re
- Page 112 and 113: ESTRADA, H., MARTÍNEZ, A., PASTOR,
- Page 114 and 115: PENADÉS, M. C., CANÓS, J. H., SÁ
- Page 116: WHITE, S. Business Process Modeling