PENADÉS, M. C., CANÓS, J. H., SÁNCHEZ, J. Automatic Derivation of WorkflowSpecifications from Organizational Structures and Use Cases. In: ANAIS DO WER01 –WORKSHOP EM ENGENHARIA DE REQUISITOS, 2001. Proceedings..., BuenosAires: [s.n.], 2001, p. 166-180.ROLLAND, C. Conceptual Mo<strong>de</strong>lling in Information Systems Engineering, Capítulo:Capturing System Intentionality with Maps, p. 141-158, Springer, 2007.ROLLAND, C., NURCAN, S., GROSZ, G. A Decision making pattern for guiding theenterprise knowledge <strong>de</strong>velopment process. Journal of Information and SoftwareTechnology, v. 42, p. 313-331, 2000.ROLLAND, C., PRAKASH, N., BENJAMEN, A. A Multi-Mo<strong>de</strong>l View of ProcessMo<strong>de</strong>lling. Requirements Engineering, v. 4, n. 4, p. 169-187, 1999.ROSCA, D., GREENSPAN, S., FEBLOWITZ, M., WILD, C. A Decision Makingmethodology in Support of the Business Rules Lifecycle. In: IEEE INTERNATIONALSYMPOSIUM ON REQUIREMENTS ENGINEERING - RE97, 1997. Proceedings...,Annapolis, MD, U.S.A.: [s.n.], 1997, p. 236-246.ROSCA, D., WILD, C. Business rules in the real world: a <strong>de</strong>cision support approach. In:EIGHTH INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING ANDKNOWLEDGE ENGINEERING – SEKE’96, 1996. Proceedings…, Lake Tahoe,California, USA: [s.n.], 1996, p. 121-128.SANTANDER, V. F. A. Integrando Mo<strong>de</strong>lagem <strong>Organizacional</strong> com Mo<strong>de</strong>lagemFuncional. Tese (Tese <strong>de</strong> Doutorado) – Engenharia <strong>de</strong> Software – Universida<strong>de</strong>Fe<strong>de</strong>ral <strong>de</strong> Pernambuco, Recife, PE, 2002.SANTANDER, V. F. A., CASTRO, J. F. Deriving Use Cases from OrganizationalMo<strong>de</strong>ling. In: IEEE JOINT INTERNATIONAL REQUIREMENTES ENGINEERINGCONFERENCE – RE02, 2002. Proceedings..., University of Essen, Germany: [s.n.],2002, p. 32–39.SANTANDER, V. F. A., CASTRO, J. F. B. Desenvolvendo Use Cases a partir <strong>de</strong>Mo<strong>de</strong>lagem <strong>Organizacional</strong>. In: WORKSHOP DE ENGENHARIA DE REQUISITOS,2000. Proceedings..., Rio <strong>de</strong> Janeiro: [s.n.], 2000, p. 158–179.SANTANDER, V. F. A., SILVA, D. R. Requirements Engineering Contributions on theDevelopment of Educational Software for the Blind or People with Impaired Vision –An Experience Account. CLEI Electronic Journal, v. 9, n. 1, 2006.100
SANTOS, R. F. Mapeamento e Mo<strong>de</strong>lagem <strong>de</strong> Processos <strong>de</strong> Negócios com BPMN,http://www.scribd.com/doc/18310726/Mapeamento-e-Mo<strong>de</strong>lagem-<strong>de</strong>-Processos-<strong>de</strong>-Negocio-com-BPMN, Consultado na Internet em: 15/05/2010.SMITH, H., FINGAR, P. Business Process Management – The Third Wave. Florida:Meghan-Kiffer Press, 2003.SOLINGEN, R., BERGHOUT, E. The Goal/Question/Metric Method: a Practical Gui<strong>de</strong>for Quality Improvement of Software Development. UK: McGraw-Hill, 1999.SOMMERVILLE, I. Software engineering. 6 ed., Addison-Wesley, 2001.SOMMERVILLE, I., SAWYER, P. Requirements Engineering: A Good Practice Gui<strong>de</strong>.John Wiley & Sons, 1997.TEIXEIRA, E. P. Integrando a Teoria da Ativida<strong>de</strong> e a Técnica i* na fase <strong>de</strong> RequisitosDetalhados. Monografia (Monografia <strong>de</strong> Curso) – Engenharia <strong>de</strong> Software –Universida<strong>de</strong> Estadual do Oeste do Paraná, Cascavel, PR, 2009. Monografia.TRAVASSOS, G. H., GUROV, D., AMARAL, E. A. G. Introdução à Engenharia <strong>de</strong>Software Experimental. Rio <strong>de</strong> Janeiro: COPPE/UFRJ, Programa <strong>de</strong> Engenharia <strong>de</strong>Sistemas e Computação, 2002. Relatório Técnico RT-ES-590/02.TROVA, E. C. V. A importância da mo<strong>de</strong>lagem dos processos <strong>de</strong> negócios para o<strong>de</strong>senvolvimento <strong>de</strong> sistema <strong>de</strong> informação: uma aplicação em gestão e controleacadêmico. Dissertação (Dissertação <strong>de</strong> Mestrado) – Engenharia <strong>de</strong> Software –Universida<strong>de</strong> Metodista <strong>de</strong> Piracicaba, Santa Bárbara D‟Oeste, 2004. Dissertação.VARA, J. L., FORTUNA, M. H., SÁNCHEZ, J., WERNER, C. M. L., BORGES, M. R. S.A Requirements Engineering Approach for Data Mo<strong>de</strong>lling of Process-AwareInformation Systems. In: 12 TH INTERNATIONAL CONFERENCE ON BUSINESS<strong>INF</strong>ORMATION SYSTEMS – BIS 2009, 2009. Proceedings…, Poznan, Poland: [s.n.],2009, p. 133-144.VICENTE, A. A., SANTANDER, V. F. A., CASTRO, J. F. B., SILVA, I. F., MATUS, F.G. R. JGOOSE: A Requirements Engineering Tool to Integrate i* OrganizationalMo<strong>de</strong>ling with User cases in Uml. Ingeniare. Revista chilena <strong>de</strong> ingeniería, v. 17, n. 1,p. 6-20, 2009.WFMC. The Workflow Management Coalition. http://www.WFMC.org, Consultado naInternet em: 20/05/2010.101
- Page 2 and 3:
FERNANDO LUIZ GRANDOAVALIANDO TÉCN
- Page 4 and 5:
DEDICATÓRIAAos meus pais e minha i
- Page 6 and 7:
AGRADECIMENTOSA Deus, pela saúde e
- Page 8 and 9:
3.24: Notações básicas para Caso
- Page 10 and 11:
Lista de Abreviaturas e SiglasB2BBP
- Page 12 and 13:
SumárioLista de Figuras ..........
- Page 14 and 15:
ResumoHoje em dia, o desenvolviment
- Page 16 and 17:
conjunto estruturado de atividades
- Page 18 and 19:
forma de satisfação de objetivos,
- Page 20 and 21:
será inserido não foi modelado e
- Page 22 and 23:
Já no Capítulo 4 o estudo compara
- Page 24 and 25:
Uma incorreta identificação de re
- Page 26 and 27:
a) Requisitos Funcionais (RF): são
- Page 28 and 29:
Kotonya e Sommerville (1998) descre
- Page 30 and 31:
Já Alencar (1999), propõe diretri
- Page 32 and 33:
Informações mais completas a resp
- Page 34 and 35:
confirmar teorias ou validar medida
- Page 36 and 37:
Sendo o GQM orientado a objetivos o
- Page 38 and 39:
No próximo capítulo são apresent
- Page 40 and 41:
Essa análise deve ser conduzida an
- Page 42 and 43:
Nas seções seguintes, serão apre
- Page 44 and 45:
Figura 3.2: Parte de um MO de uma B
- Page 46 and 47:
a) Entidade: é alguma coisa do dom
- Page 48 and 49:
componentes do Modelo de Objetivos;
- Page 50 and 51:
Figura 3.7: Exemplo de parte de um
- Page 52 and 53:
mesmo tempo seja capaz de lidar com
- Page 54 and 55:
Swimlanes (raias) (Tabela 3.3): fun
- Page 56 and 57:
Um exemplo de segmento de processo
- Page 58 and 59:
3.4 A Técnica i*A técnica i*, pro
- Page 60 and 61:
Na dependência de tarefa, o Depend
- Page 62 and 63:
3.4.2 O Modelo de Razões Estratég
- Page 64 and 65: observa nas dependências do tipo o
- Page 66 and 67: Os principais elementos do modelo s
- Page 68 and 69: egras refletem políticas do negóc
- Page 70 and 71: IFTHENELSE(sinistro é assegurado p
- Page 72 and 73: alcançar o objetivo-alvo “Realiz
- Page 74 and 75: A especificação de um caso de uso
- Page 76 and 77: Analisando brevemente algumas das t
- Page 78 and 79: Capítulo 4Estudo Comparativo e Ava
- Page 80 and 81: Figura 4.1: Ciclo de vida de projet
- Page 82 and 83: solução: desenvolver um sistema d
- Page 84 and 85: M09: As respostas coletadas de um g
- Page 86 and 87: Figura 4.2: Diagrama BPMN para o m
- Page 88 and 89: Figura 4.4: Diagrama SR para o mód
- Page 90 and 91: Figura 4.6: Diagrama SR para o mód
- Page 92 and 93: Regra de Negócio 04: REALIZAR PEDI
- Page 94 and 95: Figura 4.9: Diagrama de Casos de Us
- Page 96 and 97: No Modelo de Conceitos podem ser vi
- Page 98 and 99: formuladas, com o intuito de fornec
- Page 100 and 101: possibilitando também a divisão d
- Page 102 and 103: sendo inserido. Kaabi, Souveyet e R
- Page 104 and 105: Para o estudo comparativo foi utili
- Page 106 and 107: Capítulo 5Considerações FinaisAp
- Page 108 and 109: de Uso de Negócio não consegue re
- Page 110 and 111: BIDER, I., JOHANNESSON, P. Tutorial
- Page 112 and 113: ESTRADA, H., MARTÍNEZ, A., PASTOR,
- Page 116: WHITE, S. Business Process Modeling