NOMINATION DOSSIER ANNEX 7.3.2<br />

"ANCIENT BEECH FORESTS OF GERMANY"<br />

Measure 5: Sustainable land management in the buffer zone of the Grumsin<br />

component part<br />

Negotiations with landowners are to be continued in the Grumsin component part with<br />

the objective of comprehensively sustainable land use. The relocation and acquisition<br />

activities will be continued with the aim of transferring the entire area to public<br />

ownership or to the Kulturlandschaft Uckermark e.V. association until 2020.<br />

Objective V: Risk management<br />

Developing a risk management including stipulations regarding its implementation is a<br />

worthwhile effort to protect the site. There were no palpable threats at the time the nomination<br />

dossier was being prepared.<br />

Measure 1: Potential risk scenarios for the <strong>World</strong> <strong>Heritage</strong> area<br />

The scenarios might be centred on the following events:<br />

climate change<br />

substance input<br />

infrastructural measures within the area or surroundings (e.g. road or railroad construction,<br />

canalisation, overhead power lines, radio interference, wind energy).<br />

research activities<br />

game stock<br />

invasive species<br />

tourism<br />

Measure 2: Creation of a risk management<br />

The steering group will create a coordinated risk management together with an<br />

appropriate action plan based on the results of Measures 1 (scenarios). The risk<br />

management will undergo continuous updating based on the results of the similarly<br />

coordinated monitoring and the (international) research projects and developments.<br />

Objective VI: Wildlife management<br />

The goal of undisturbed natural development also includes wildlife management. The aim is<br />

to forego any utilisation-oriented hunting in every one of the areas. Wildlife management is<br />

exclusively limited to the required activities arising from the risk management scenarios.<br />

Measure 1: Reorganising wildlife management in the Grumsin and Jasmund<br />

component parts<br />

Active wildlife management in the Grumsin and Jasmund component parts will be<br />

shifted to the buffer zone and surroundings at an early point. With the exception of<br />

such years in which there game monitoring yields evidence of excessive hoofed game<br />

populations, the nominated component parts are kept free of game population control.<br />