SPS Policy Manual - Saginaw Public Schools
SPS Policy Manual - Saginaw Public Schools
SPS Policy Manual - Saginaw Public Schools
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Section 4000 – Business Management/Facilities Management<br />
4800 Educational Specifications 4800<br />
The Superintendent shall assume the responsibility of working with staff to determine<br />
educational specifications for all new or renovated construction. These specifications shall be<br />
approved by the Board and then discussed in conferences with the architect.<br />
1. Information concerning the plan of the school organization and estimated enrollment in the<br />
proposed building,<br />
2. A description of the proposed curriculum and the teaching methods and techniques to be<br />
employed,<br />
3. A schedule of space requirements, including the indications of relative locations of various<br />
spaces,<br />
4. A desired layout of special areas and the equipment needed for such areas,<br />
5. An outline of mechanical features and special finishes desired,<br />
6. A description of standard codes and regulations (school District, city, county, and state)<br />
affecting the particular planning, and<br />
7. Any other details, which may be needed or recommended relative to the specific project.<br />
Approved:<br />
4890 Supervision of Construction (Cf. 4770) 4890<br />
Supervision of construction projects shall be primarily the responsibility of the architect<br />
and the Superintendent, or designee assigned by the Superintendent as project manager, who shall<br />
be responsible to follow closely the progress of the construction project.<br />
Change Orders<br />
After a contract is accepted, all change orders shall be brought to the Buildings and<br />
Grounds Committee and the Board for approval, except that the Superintendent is authorized to<br />
approve minor changes of an emergency nature of $10,000.00 or 10% of the contract or less when<br />
“on the spot” decisions must be made.<br />
Change orders shall be accompanied by justification by the architect and/or the<br />
Superintendent when being presented to the Buildings and Grounds Committee.<br />
Approved:<br />
4900 Fair Employment Clause 4900<br />
Any contract to which the Board or District is a party shall contain a covenant by the<br />
contractor, and the subcontractors of the contractor, not to discriminate against an employee or<br />
applicant for employment with respect to hire, tenure, terms, conditions, or privileges of<br />
employment, or a matter directly or indirectly related to employment, because of race, color,<br />
religion, national origin, age, sex, height, weight, marital status, or handicap/disability. A breach<br />
of this covenant may be regarded as a material breach of the contract in the discretion of the<br />
Board.<br />
Approved:<br />
LEGAL REF: MCL 37.1101-1606 (Person’s with Disabilities Civil Rights Act); 37.2101-2804<br />
(Elliott-Larsen Civil Rights Act)<br />
SCHOOL DISTRICT OF THE CITY OF SAGINAW