05.06.2013 Views

Manual T*SOL basic 5.0 - Valentin Software

Manual T*SOL basic 5.0 - Valentin Software

Manual T*SOL basic 5.0 - Valentin Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

User <strong>Manual</strong> <strong>T*SOL</strong> 13 Appendix<br />

Annual heating requirement, specific, qh [kWh]<br />

The heat, based on the floor space, that must be yielded within a year to maintain a target<br />

temperature in the building (effective energy).<br />

Annuity A<br />

A series of equal payments, allowing for → lifetime and interest rate, for repayment of a capital debt.<br />

It is the product of annuity factor and investment sum.<br />

Anti-Legionnaire's switch LEG<br />

The guidelines of the German Association for Gas and Water specify that the entire content of the<br />

storage tanks and the piping in systems with a drinking water storage tank size of 400 liters and<br />

domestic hot water pipe content of over 3 liters must be heated to 60° once a day. The hot water<br />

storage tank is loaded in adjustable intervals in systems with an anti-Legionnaire's switch.<br />

Annual energy requirement<br />

-> Final energy requirement<br />

Aperture Aa (m 2 )<br />

Largest projected area through which unconcentrated solar irradiation enters the collector. In flat<br />

plate collectors, the area of the collector covering through which solar irradiation can penetrate the<br />

inside of the collector housing (light penetration area). In evacuated tube collectors, the aperture is<br />

the product of the length and width of the absorber strip and the number of tubes. If evacuated tube<br />

collectors are fitted with a reflector (→ CPC), the aperture is equal to the product of the length and<br />

width of the mirror surface<br />

Auxiliary heating AuxH<br />

Ensures that the → target temperature is reached even when there is insufficient irradiation. Where<br />

applicable, it also supplies the heating loop. Usually refers to the boiler.<br />

A/V ratio<br />

The A/V ration is the quotient of area to volume and is displayed in the unit 1/m.<br />

Balance (B)<br />

→ Energy balance<br />

Balancing<br />

→ Energy balance<br />

Base load [W, kW]<br />

Minimum load / output an energy supply system must make available constantly during a period of<br />

use.<br />

Boiler Boil<br />

Serves to convert chemical energy into heat.<br />

Boiler efficiency η [-]<br />

The boiler efficiency describes the relationship between the energy used by the boiler and the energy<br />

produced over a specific period of time.<br />

Buffer tank Buff<br />

A storage tank filled with domestic hot water, usually in steel. The heat is transferred either<br />

internally via a serpentine pipe or outside the tank by means of an external heat transfer medium.<br />

Building energy requirement Qb [kWh/a]<br />

Generic term for heating requirements, cooling requirements, energy requirements for hot drinking<br />

water, lighting, humidification.<br />

Dr. <strong>Valentin</strong> Energie<strong>Software</strong> GmbH page 90 / 104

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!