XII. HIGHER EDUCATION SUPPLEMENT<br />

A. CCPE Review: CCPE review will be required.<br />

B. Method <strong>of</strong> Contracting:<br />

1. Method: The contract for the new facility will be competitively bid and awarded to<br />

the lowest responsible bidder.<br />

2. Rationale for Method Selection: Bidding conditions in the Lincoln construction<br />

market are currently favorable, and are expected to yield the most favorable price at<br />

the time the project is scheduled to bid.