New alignment Hwy. 169 to Hennepin County Road 81 (Elm Creek Blvd)<br />

<strong>State</strong> Project No. 2771-38<br />

http://www.dot.state.mn.us/metro/projects/610/<br />

Schedule:<br />

Environmental Document Approval Date:<br />

Municipal Consent Approval Date:<br />

Geometric Layout Approval Date:<br />

Construction Limits Established Date:<br />

Original Letting Date: 2023<br />

Current Letting Date: 8/14/2009<br />

Construction Season: 2009-2011<br />

Estimated Substantial Completion:<br />

Project History:<br />

Hwy. 610 is a four-lane, Principal Arterial roadway<br />

in the northwestern Metro suburbs. The 1981 draft<br />

Environmental Impact <strong>State</strong>ment showed a need<br />

for a principal arterial in this area. The first phases<br />

of Hwy. 610 were constructed during 1987 and<br />

between 1997 and 2001, which completed work<br />

between Hwy. 10 and Hwy. 169. The remaining<br />

portion of the corridor to be completed will extend<br />

Hwy. 610 from Hwy. 169 to I 94, - the first project<br />

will build the corridor from Hwy. 169 to County<br />

Road 81 and the second project will complete the<br />

corridor from County Road 81 to I 94. This<br />

document addresses the first.<br />

Project Benefits:<br />

Provide another Principal Arterial in the NW Metro<br />

to relieve congestion along I 94, improve safety by<br />

removing traffic demand on the surrounding local<br />

roadway system<br />

Project Risks:<br />

Design-Build<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 610<br />

Project Description:<br />

This project is to continue the construction of<br />

Hwy. 610. It will extend a four-lane freeway<br />

section from Hwy. 169 to Hennepin County<br />

Road 81 on new alignment. The project will<br />

help complete the next step in extending the<br />

National Highway System between I 94 and I<br />

35W in the northern Twin Cities metropolitan<br />

area.<br />

Xenium La<br />

Elm Creek Blvd<br />

Territorial Rd<br />

Weaver Lake Rd<br />

Pineview La<br />

Dayton<br />

95th Ave<br />

91st Ave<br />

90th Pl<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Construction Letting:<br />

Other Construction Elements:<br />

Engineering:<br />

Right of Way:<br />

Recent Changes and Updates:<br />

Grove Dr<br />

Rosewood La<br />

96th Ave<br />

Sycamore La<br />

89th Pl<br />

88th Pl<br />

Norwood La<br />

Ives La<br />

100th Pl<br />

Maple Grove<br />

93rd Ave<br />

92nd Ave<br />

90th Ave<br />

Jonquil La<br />

Elm Creek Rd<br />

99th Pl<br />

99th Ave<br />

98th Ave<br />

97th Pl<br />

Hemlock La<br />

Goldenrod La<br />

Forestview La<br />

86th Ave N<br />

85th Pl N<br />

88th Pl<br />

88th Ave<br />

Goose Lake Rd<br />

Zachary La<br />

Yorktown La<br />

91st Ave<br />

Preserve La<br />

Boundary Creek Ter<br />

100th Ave<br />

Hennepin<br />

85th Ave<br />

Trenton La<br />

Saratoga La<br />

Revere La<br />

Quaker La<br />

95th Pl<br />

Valley Forge La<br />

89th Ave<br />

Goose Lake Pkwy<br />

Fernwood La N<br />

Tanglewood La N<br />

105th Ave<br />

Maple Valley Dr<br />

Revere La<br />

Hidden Oaks La N<br />

Quaker La<br />

107th Pl<br />

Pilgrim La<br />

94th Ave<br />

108th Pl<br />

101st Ave<br />

81st Ave<br />

Champlin<br />

Nathan La<br />

101st Pl<br />

Elm Creek Pkwy<br />

Lancaster La<br />

99th Pl<br />

99th Ave<br />

98th Pl<br />

96th Pl<br />

103rd Ave<br />

Pilgrim Way<br />

93rd Pl<br />

2nd Ave W<br />

Monticello La<br />

103rd Pl<br />

102nd Pl<br />

6th St N<br />

Jefferson Hwy<br />

109th Ave N<br />

169<br />

Brooklyn Park<br />

7th St<br />

4th St N<br />

3rd St N<br />

1st Ave W<br />

3rd Ave E<br />

Lakeside Tr<br />

Osseo<br />

Project is over 70% completed end of 2010. Work will be 100% by the summer of 2011<br />

Key Cost Estimate Assumptions:<br />

Elm Creek Blvd<br />

81<br />

90th Pl<br />

87th Way<br />

Underwood La<br />

94th Pl<br />

93rd Pl<br />

Quinwood La<br />

84th Ave<br />

82nd Ave<br />

92nd Pl<br />

91st Pl<br />

99th Ave<br />

86th Pl<br />

Norwood La<br />

Hemlock Way<br />

Kirkwood La<br />

Ives Ct<br />

Hemlock La<br />

101st Ave<br />

Jonquil La<br />

Forestview La<br />

Cottonwood La<br />

Cottonwood La<br />

Balsam La<br />

97th Ave<br />

Cottonwood La<br />

Zachary La<br />

86th Ave N<br />

108th Ave<br />

Wellington La<br />

93rd Ave<br />

109<br />

104th Pl<br />

103rd Ave<br />

101st Pl<br />

97th Pl<br />

96th Ave<br />

94th Pl<br />

Revere La<br />

Oak Wood La N<br />

Elm Creek Tr<br />

108th Ave<br />

100th Ave<br />

104th Ave<br />

Baseline Est. Current Est.<br />

202<br />

47.8<br />

0.0<br />

0.0<br />

12.0<br />

Total: $ 49.8<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

$<br />

$<br />

$<br />

$<br />

Orleans La<br />

3rd Ave W<br />

Zopfi Way<br />

105th Pl<br />

Woods Tr N<br />

102nd Ave<br />

Parkside Tr<br />

99th Pl<br />

97th Pl<br />

Fair Way<br />

E Broadway St<br />

<strong>Minnesota</strong> Department of Transportation<br />

District M<br />

1500 West County Road B2<br />

(651) 234-7500<br />

District Engineer: Scott McBride<br />

Project Manager: Ramankutty Kannankutty<br />

Original date of Posting: Jan, 2009<br />

Revised Date: 1/15/2011<br />

110th Ave N<br />

Jefferson La<br />

Jefferson Hwy<br />

30<br />

3rd Ave E<br />

4th Ave E<br />

5th Ave E<br />

7th Ave E<br />

83rd Ave<br />

6th Ave E<br />

Champlin Dr<br />

8th Ave E<br />

2nd St S<br />

3rd St S<br />

4th St S<br />

Zealand Ave<br />

Lakeland Ave<br />

117th Ave N<br />

Business Park Blvd<br />

Xylon Ct<br />

Wisconsin Ave<br />

Xylon Ave<br />

Wyoming Ave<br />

109th Pl<br />

Utah Ave<br />

113th Ave N<br />

Utah Ave N<br />

103<br />

Winnetka Ave<br />

97th Ave<br />

93rd Ave<br />

89th Ave<br />

85th Ct<br />

Sumter Ave<br />

82nd Ave<br />

Winnetka Ave N<br />

Winnetka Ave<br />

College Park Dr<br />

81st Ave<br />

Page H20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!