Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Pending Approval<br />
Construction Limits Established Date: Pending Approval<br />
Original Letting Date: 12/17/2010<br />
Current Letting Date: 6/8/2012<br />
Construction Season: 2012/2013<br />
Estimated Substantial Completion: 2013<br />
Project History:<br />
Highway 1 between 0.3 Miles West of Six Mile<br />
Lake Rd to Deer Haven Rd has substandard<br />
horizontal and vertical alignments, narrow<br />
shoulders and steep in-slopes, lack of safety turn<br />
lanes, trees/vegetation encroachment in the<br />
highway clear zone, and lack of safe passing<br />
opportunities. Some above mentioned safety<br />
problems contribute to crash rates on some<br />
sements of the highway to be higher then the<br />
district average and statewide average for miles of<br />
two lane highways.<br />
Project Benefits:<br />
Improve Safety by improving vertical and<br />
horizontal alignment.<br />
Project Risks:<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 1<br />
0.3 Miles west of Six Mile Rd to Deer Haven Rd<br />
<strong>State</strong> Project No. 6904-46<br />
www.dot.state.mn.us/d1/projects/hwy1_tower_ely<br />
Project Description:<br />
The project is located in St. Louis County.<br />
The proposed project is a reconstruction and<br />
passing lane project located 0.3 Miles west<br />
of Six Mile Lake Rd to Deer Haven Rd. The<br />
project is a total reconstruction of 4.8 miles<br />
of Hwy. 1. It includes pipe culvert<br />
replacements and the addition of turn lanes.<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
627<br />
26<br />
969<br />
408<br />
797<br />
775<br />
585<br />
360<br />
797<br />
318<br />
599<br />
360<br />
Saint Louis<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 10.6<br />
$ 14.4<br />
Other Construction Elements: $ 0.4<br />
$ 0.6<br />
Engineering: $ 2.1<br />
$ 2.9<br />
Right of Way: $ 1.1<br />
$ 0.0<br />
Total: $ 14.2 $ 19.0<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2745<br />
District Engineer: Michael Robinson<br />
Project Manager: Brian Larson<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
21<br />
796<br />
408<br />
795<br />
774<br />
128<br />
583<br />
620<br />
593<br />
904<br />
795<br />
404<br />
490<br />
698<br />
Babbitt<br />
70<br />
Page A3