Schedule:<br />
Environmental Document Approval Date: 1/1/2007. ReEval n<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: 9/24/2010<br />
Construction Limits Established Date: 8/16/2010<br />
Original Letting Date: 7/23/2010<br />
Current Letting Date: 09/23/2011<br />
Construction Season: 2011-2013<br />
Estimated Substantial Completion: 2013<br />
Project History:<br />
This project is a 4-lane expansion. Construct<br />
Bridge. 69044 and Bridge. 69045. The new<br />
bridges are being built on new alignment.<br />
The previous pavement repair in the project areas<br />
were:<br />
1980 - Bituminous surfacing - full length<br />
1992 - 2005 mill and bituminous overlay -<br />
numerous segments<br />
Project Benefits:<br />
Provide additional driving lanes, improve ride,<br />
reduce maintenance costs<br />
Project Risks:<br />
PROJECT SUMMARY<br />
Hwy. 53<br />
4.5 miles south of Junction Hwy. 1 to south limits of Cook<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Bridge 69044, 69045<br />
<strong>State</strong> Project No. 6920-48<br />
Project Description:<br />
The project is located in St. Louis County.<br />
The proposed project is a reconstruction on<br />
a new alignment and consists of grading,<br />
surfacing and Bridges from 4.5 miles S of<br />
Hwy. 1 to south limits of Cook (4-lane<br />
expansion). The project also includes pipe<br />
culvert replacements.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
488<br />
500<br />
923<br />
668<br />
25<br />
Saint Louis<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 34.0<br />
$ 42.9<br />
Other Construction Elements: $ 1.4<br />
$ 1.7<br />
Engineering: $ 6.8<br />
$ 8.6<br />
Right of Way: $ 0.5<br />
$ 0.4<br />
Total: $ 42.7 $ 53.6<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
This project was deferred due to the SRC cuts that occurred in fiscal years 2010 and 2011.<br />
The loss of state funds made it impossible to match the HPP funds in the year the project<br />
was originally planned.<br />
Key Cost Estimate Assumptions:<br />
936<br />
488<br />
917<br />
914<br />
660<br />
668<br />
467<br />
540<br />
930<br />
937<br />
937<br />
487<br />
936<br />
487<br />
918<br />
22<br />
912<br />
912<br />
910<br />
124<br />
Cook<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2745<br />
District Engineer: Michael Robinson<br />
Project Manager: Brian Larson<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
652<br />
428<br />
652<br />
24<br />
597<br />
948<br />
115<br />
492<br />
600<br />
951<br />
987<br />
952<br />
936<br />
87<br />
430<br />
427<br />
683<br />
431<br />
431<br />
421<br />
512<br />
429<br />
478<br />
478<br />
78<br />
540<br />
758<br />
820<br />
381<br />
419<br />
Page A11