Schedule:<br />

Environmental Document Approval Date: 1/1/2007. ReEval n<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: 9/24/2010<br />

Construction Limits Established Date: 8/16/2010<br />

Original Letting Date: 7/23/2010<br />

Current Letting Date: 09/23/2011<br />

Construction Season: 2011-2013<br />

Estimated Substantial Completion: 2013<br />

Project History:<br />

This project is a 4-lane expansion. Construct<br />

Bridge. 69044 and Bridge. 69045. The new<br />

bridges are being built on new alignment.<br />

The previous pavement repair in the project areas<br />

were:<br />

1980 - Bituminous surfacing - full length<br />

1992 - 2005 mill and bituminous overlay -<br />

numerous segments<br />

Project Benefits:<br />

Provide additional driving lanes, improve ride,<br />

reduce maintenance costs<br />

Project Risks:<br />

PROJECT SUMMARY<br />

Hwy. 53<br />

4.5 miles south of Junction Hwy. 1 to south limits of Cook<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Bridge 69044, 69045<br />

<strong>State</strong> Project No. 6920-48<br />

Project Description:<br />

The project is located in St. Louis County.<br />

The proposed project is a reconstruction on<br />

a new alignment and consists of grading,<br />

surfacing and Bridges from 4.5 miles S of<br />

Hwy. 1 to south limits of Cook (4-lane<br />

expansion). The project also includes pipe<br />

culvert replacements.<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

488<br />

500<br />

923<br />

668<br />

25<br />

Saint Louis<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 34.0<br />

$ 42.9<br />

Other Construction Elements: $ 1.4<br />

$ 1.7<br />

Engineering: $ 6.8<br />

$ 8.6<br />

Right of Way: $ 0.5<br />

$ 0.4<br />

Total: $ 42.7 $ 53.6<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Recent Changes and Updates:<br />

This project was deferred due to the SRC cuts that occurred in fiscal years 2010 and 2011.<br />

The loss of state funds made it impossible to match the HPP funds in the year the project<br />

was originally planned.<br />

Key Cost Estimate Assumptions:<br />

936<br />

488<br />

917<br />

914<br />

660<br />

668<br />

467<br />

540<br />

930<br />

937<br />

937<br />

487<br />

936<br />

487<br />

918<br />

22<br />

912<br />

912<br />

910<br />

124<br />

Cook<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2745<br />

District Engineer: Michael Robinson<br />

Project Manager: Brian Larson<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

652<br />

428<br />

652<br />

24<br />

597<br />

948<br />

115<br />

492<br />

600<br />

951<br />

987<br />

952<br />

936<br />

87<br />

430<br />

427<br />

683<br />

431<br />

431<br />

421<br />

512<br />

429<br />

478<br />

478<br />

78<br />

540<br />

758<br />

820<br />

381<br />

419<br />

Page A11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!