Schedule:<br />

Environmental Document Approval Date: 05/01/2009<br />

Municipal Consent Approval Date:<br />

Geometric Layout Approval Date:<br />

Construction Limits Established Date:<br />

Original Letting Date: 01/22/2010<br />

Current Letting Date: 4/23/2010<br />

Construction Season: 2010-2011<br />

Estimated Substantial Completion: Fall 2010<br />

Project History:<br />

The west bound lanes of Hwy. 10 were<br />

constructed in 1951. A joint sealing project was<br />

conducted in 1974, followed by a repair project in<br />

1997. The shoulders and turn lanes are<br />

bituminous.<br />

Project Benefits:<br />

The new pavement will provide a smooth ride and<br />

will require minimal maintenance over the next 20<br />

years. The widened lanes will meet current<br />

standards.<br />

Project Risks:<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 10<br />

Westbound lanes from St. Cloud to Clear Lake<br />

<strong>State</strong> Project No. 7103-51<br />

SUBSTANTIALLY COMPLETE<br />

Project Description:<br />

Pavement replacement on westbound lanes<br />

from St. Cloud to Clear Lake, includes<br />

intersection reconstruction at 15th Avenue<br />

SE in St. Cloud and at Hwy 24 in Clear<br />

Lake. The existing 11 foot wide travel lanes<br />

will be widened to 12 feet to meet current<br />

standards.<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

Sauk Rapids<br />

46<br />

Saint Cloud<br />

MISSISSIPPI R<br />

7<br />

94<br />

1<br />

Stearns<br />

Saint Augusta<br />

44<br />

63<br />

8<br />

45<br />

75<br />

45<br />

8<br />

65<br />

91<br />

90<br />

47<br />

Benton<br />

The estimate was based on estimated quantities and average bid prices.<br />

10<br />

143<br />

7<br />

3<br />

Sherburne<br />

66<br />

Wright<br />

Clearwater<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 16.9<br />

$ 13.6<br />

Other Construction Elements: $ 0.0<br />

$ 0.0<br />

Engineering: $ 3.4<br />

$ 3.4<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 20.3 $ 17.0<br />

78<br />

57<br />

61<br />

20<br />

76<br />

25<br />

62<br />

16<br />

6<br />

48<br />

Clear Lake<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 3<br />

7694 Industrial Boulevard<br />

(218) 828-5700<br />

District Engineer: Robert Busch<br />

Project Manager: Claudia Dumont<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

58<br />

71<br />

55<br />

54<br />

Page C2