Schedule:<br />
Paynesville bypass<br />
<strong>State</strong> Project No. 3408-15<br />
http://www.dot.state.mn.us/d8/projects/paynesvillebypass/index.html<br />
Environmental Document Approval Date: 05/20/2008<br />
Municipal Consent Approval Date: 07/09/2008<br />
Geometric Layout Approval Date: 07/20/2006<br />
Construction Limits Established Date: 11/11/2008<br />
Original Letting Date: 12/23/2005<br />
Current Letting Date: 1/29/2010<br />
Construction Season: Spring 2010 to Summer 2012<br />
Estimated Substantial Completion: 08/01/2012<br />
Project History:<br />
The need for this project is regional mobility,<br />
highway capacity, deteriorating pavement, and<br />
highway safety. The purpose of this project is to<br />
provide greater mobility, highway capacity,<br />
adequate access to mobility, highway capacity,<br />
adequate access to City of Paynesville, greater<br />
traffic safety, and reduce or eliminate roadway<br />
deficiencies.<br />
Project Benefits:<br />
Provide greater mobility on the Willmar to St.<br />
Cloud corridor, increase highway capacity,<br />
improve safety<br />
Project Risks:<br />
The major risk of potential contaminated soil in<br />
former Paynesville City Dump has been greatly<br />
mitigated with an alignment shift.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 23<br />
Project Description:<br />
New construction of 4-lane bypass of<br />
Paynesville on new alignment<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
129<br />
15<br />
2<br />
31<br />
2<br />
40<br />
130<br />
98<br />
19<br />
178<br />
106<br />
68<br />
Kandiyohi<br />
103<br />
143<br />
102<br />
6<br />
20<br />
105<br />
39<br />
20<br />
39<br />
130<br />
179<br />
32<br />
25<br />
16<br />
Stearns<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 46.0<br />
$ 44.9<br />
Other Construction Elements: $ 4.0<br />
$ 4.0<br />
Engineering: $ 10.0<br />
$ 10.0<br />
Right of Way: $ 13.0<br />
$ 10.0<br />
Total: $ 73.0 $ 68.9<br />
181<br />
66<br />
33<br />
Meeker<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 8<br />
2505 Transportation Road<br />
(320) 231-5195<br />
District Engineer: Jon Huseby<br />
Project Manager: Lowell Flaten<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />