Schedule:<br />
Environmental Document Approval Date: 2010<br />
Municipal Consent Approval Date: Dec-10<br />
Geometric Layout Approval Date: Oct-10<br />
Construction Limits Established Date: Pending Approval<br />
Original Letting Date: 2011/2014<br />
Current Letting Date: 2012<br />
Construction Season: Stage 1 - 2012<br />
Estimated Substantial Completion:<br />
Project History:<br />
Nisswa to Pine River<br />
<strong>State</strong> Project No. 1810-92<br />
http://www.dot.state.mn.us/d3/projects/hwy371/index.html<br />
Final Environmental Impact <strong>State</strong>ment and Record<br />
of Decision were issued in 2005. In 2007, Pequot<br />
Lakes formally reversed its previous decision to<br />
have the new highway utilize the existing highway<br />
corridor and requested Mn/DOT to change<br />
preferred alignment to a bypass of the<br />
community. This caused the need for a<br />
supplement to the completed Environmental<br />
Impact <strong>State</strong>ment. This process was completed in<br />
2010. Funding constraints have caused Mn/DOT<br />
to delay this project several times since initiating<br />
the project in 2002.<br />
Project Benefits:<br />
Improved safety, reduced congestion, correction of<br />
design deficiencies<br />
Project Risks:<br />
Pequot Lakes bypass controversial, supplemental<br />
Environmental Impact <strong>State</strong>ment may be<br />
challenged, budget constraints may continue to<br />
delay project to an undetermined times, turnover<br />
of community leadership may cause significant<br />
changes, continued development along the<br />
existing corridor has the potential to cause<br />
significant changes to the chosen alignment or<br />
increase cost of required R/W<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 371<br />
Project Description:<br />
Expansion of 16 miles of existing two-lane<br />
medium priority Interregional Corridor to a<br />
divided four-lane highway facility. Project<br />
limits include the communities of Nisswa and<br />
Pequot Lakes (Stage 1 & 2) and Jenkins and<br />
Pine River (Stage 3 - not programmed).<br />
Environmental Impact <strong>State</strong>ment level<br />
environmental documentation required as<br />
well as Municipal Consent for each of the<br />
affected communities.<br />
Total Project Cost Estimate (millions)<br />
29<br />
78<br />
114<br />
Cass<br />
17<br />
Lake Shore<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
77<br />
Jenkins<br />
145<br />
112<br />
16<br />
Pequot Lakes<br />
168<br />
11<br />
Nisswa<br />
Crow Wing<br />
Layout: Bypass of Pequot Lakes, elimination of grade separated interchanges<br />
It was delayed over the years because of department/district priorities and emphasis on<br />
preservation. A Supplemental Final EIS was completed in 2010. Municipal consent was<br />
granted in Pequot Lakes in Dec 2010. A small project has been scheduled for 2012 in<br />
coordination with realignment of crow wing county Road 18 in Nisswa.<br />
Key Cost Estimate Assumptions:<br />
92.0<br />
18.4<br />
17.7<br />
28.8<br />
107<br />
Baseline Est. Current Est.<br />
Total: $ 156.9<br />
Breezy Point<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Alignment studied in Supplemental Environmental Impact <strong>State</strong>ment will not have significant<br />
changes, 300' R/W corridor, R/W donation and spray irrigation field mitigation by Pequot<br />
Lakes, no interchanges, turnback of existing Hwy. 371 alignment to County Pequot Lakes<br />
$<br />
$<br />
$<br />
$<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 3<br />
7694 Industrial Boulevard<br />
(218) 828-5700<br />
District Engineer: Robert Busch<br />
Project Manager: Jim Hallgren<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
18<br />
Page C7