Schedule:<br />

Environmental Document Approval Date: 11/2/2009<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: Not Needed<br />

Construction Limits Established Date: 11/10/2008<br />

Original Letting Date: 7/22/2011<br />

Current Letting Date: 5/7/2010<br />

Construction Season: 2010-2011<br />

Estimated Substantial Completion: Fall 2011<br />

Project History:<br />

The pavement condition of Highway 65 between<br />

north limits of Nashwauk to the West Junction of<br />

Hwy. 1 is in disrepair.<br />

The previous pavement repair in the project areas<br />

were:<br />

1995 - Bituminous overlay - Nashwauk to 9.4 miles<br />

north (9.4 miles)<br />

1999-2000 - Bituminous overlay - various locations<br />

(6.5 miles)<br />

2001-2002 - Mill and bituminous overlay - Junction<br />

Hwy. 1 South 25.1 miles West (25 miles)<br />

Project Benefits:<br />

Improve ride, extend useful life of roadway, reduce<br />

maintenance costs<br />

Project Risks:<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 65<br />

North limits of Nashwauk to Hwy. 1<br />

<strong>State</strong> Project No. 3112-34<br />

Project Description:<br />

The project is located in Itasca County The<br />

proposed project is a pavement reclamation<br />

from the North limits of Nashwauk to the<br />

West Junction of Hwy 1. The project also<br />

includes pipe culvert replacements. The<br />

proposed project will have 2-12' driving<br />

lanes, 1' paved shoulders and 1' aggregate<br />

shoulders.<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Koochiching<br />

Itasca<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 13.2<br />

$ 10.5<br />

Other Construction Elements: $ 0.7<br />

$ 0.4<br />

Engineering: $ 2.0<br />

$ 2.1<br />

Right of Way: $ 0.3<br />

$ 0.6<br />

Total: $ 16.2 $ 13.6<br />

Saint Louis<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

The project has been let and is under construction. As some risks were mitigated the bid<br />

costs came in lower than the earlier estimated costs.<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2745<br />

District Engineer: Michael Robinson<br />

Project Manager: Brian Larson<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

Page A14