Schedule:<br />
Environmental Document Approval Date: 11/2/2009<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date: 11/10/2008<br />
Original Letting Date: 7/22/2011<br />
Current Letting Date: 5/7/2010<br />
Construction Season: 2010-2011<br />
Estimated Substantial Completion: Fall 2011<br />
Project History:<br />
The pavement condition of Highway 65 between<br />
north limits of Nashwauk to the West Junction of<br />
Hwy. 1 is in disrepair.<br />
The previous pavement repair in the project areas<br />
were:<br />
1995 - Bituminous overlay - Nashwauk to 9.4 miles<br />
north (9.4 miles)<br />
1999-2000 - Bituminous overlay - various locations<br />
(6.5 miles)<br />
2001-2002 - Mill and bituminous overlay - Junction<br />
Hwy. 1 South 25.1 miles West (25 miles)<br />
Project Benefits:<br />
Improve ride, extend useful life of roadway, reduce<br />
maintenance costs<br />
Project Risks:<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 65<br />
North limits of Nashwauk to Hwy. 1<br />
<strong>State</strong> Project No. 3112-34<br />
Project Description:<br />
The project is located in Itasca County The<br />
proposed project is a pavement reclamation<br />
from the North limits of Nashwauk to the<br />
West Junction of Hwy 1. The project also<br />
includes pipe culvert replacements. The<br />
proposed project will have 2-12' driving<br />
lanes, 1' paved shoulders and 1' aggregate<br />
shoulders.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Recent Changes and Updates:<br />
Koochiching<br />
Itasca<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 13.2<br />
$ 10.5<br />
Other Construction Elements: $ 0.7<br />
$ 0.4<br />
Engineering: $ 2.0<br />
$ 2.1<br />
Right of Way: $ 0.3<br />
$ 0.6<br />
Total: $ 16.2 $ 13.6<br />
Saint Louis<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
The project has been let and is under construction. As some risks were mitigated the bid<br />
costs came in lower than the earlier estimated costs.<br />
Key Cost Estimate Assumptions:<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2745<br />
District Engineer: Michael Robinson<br />
Project Manager: Brian Larson<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
Page A14