Schedule:<br />
Environmental Document Approval Date: 10/14/2010<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Need Unknown<br />
Construction Limits Established Date: Assume no R/W need<br />
Original Letting Date: 11/19/2010<br />
Current Letting Date: 1/28/2011<br />
Construction Season: Spring 2011<br />
Estimated Substantial Completion: Fall 2011<br />
Project History:<br />
PROJECT SUMMARY<br />
I 35<br />
North of Hinckley to South of Sandstone (North &South Bound)<br />
<strong>State</strong> Project No. 5880-177<br />
This section of Interstate 35 carries an average of<br />
16,700 vehicles per day, approximately 7% of<br />
which are classified as heavy commercial<br />
vehicles. Pavement modeling (based on current<br />
ride quality conditions, existing pavement type,<br />
and traffic levels) indicates this section of road will<br />
need pavement preservation to improve its ride<br />
quality and thereby extend its useful life.<br />
Project Benefits:<br />
Improved ride quality for road users, extend useful<br />
life<br />
Project Risks:<br />
The scope and location of this project has been<br />
changed from Bituminous overlay to unbonded<br />
concrete overlay reducing the risks of fluctuating<br />
Bituminous prices but a price spike in concrete is<br />
still a valid risk.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Project Description:<br />
Project begins 1.8 Miles south of the north<br />
Pine County Line and continues north to 2.6<br />
Miles south of Carlton County Road 4. All<br />
13.2 Miles of southbound lanes will be<br />
preserved with an unbonded concrete<br />
overlay. 4.5 Miles of the north lanes will be<br />
preserved with an unbonded concrete<br />
overlay. Traffic will be reduced to two-lanes<br />
during construction. Access to Barnum and<br />
Highway 73 at Moose Lake will be provided<br />
during construction.<br />
Aitkin<br />
Kanabec<br />
83<br />
Brook Park<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
13<br />
34<br />
85<br />
84<br />
20<br />
2<br />
23<br />
25<br />
3<br />
30<br />
21<br />
29<br />
38<br />
143<br />
140<br />
36<br />
131<br />
26<br />
17<br />
41<br />
17<br />
156<br />
18<br />
150<br />
28<br />
54<br />
40<br />
Denham<br />
27<br />
140<br />
39<br />
Finlayson<br />
61<br />
140<br />
35<br />
151<br />
Hinkley<br />
Hinkley<br />
133<br />
61<br />
134<br />
9782<br />
144<br />
16<br />
133<br />
42<br />
34<br />
Willow River<br />
Rutledge<br />
Pine<br />
5718<br />
Sandstone<br />
15<br />
52<br />
129<br />
12/21/2010<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 16.5<br />
$ 11.3<br />
Other Construction Elements: $ 1.1<br />
$ 0.6<br />
Engineering: $ 3.5<br />
$ 2.3<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 21.2 $ 14.1<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
The scope and project limit changes required more time to develop it and hence caused the<br />
delay from initially mentioned Let date. The change from bituminous overlay to unbonded<br />
concrete reduced the costs of the project significantly.<br />
Key Cost Estimate Assumptions:<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2700<br />
District Engineer: Michael Robinson<br />
Project Manager: Todd Campbell<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
61<br />
29<br />
20<br />
152<br />
33<br />
Askov<br />
142<br />
19<br />
21<br />
43<br />
145<br />
149<br />
30<br />
136<br />
32<br />
Bruno<br />
Page A6<br />
22