Schedule:<br />

Environmental Document Approval Date: 10/14/2010<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date: Need Unknown<br />

Construction Limits Established Date: Assume no R/W need<br />

Original Letting Date: 11/19/2010<br />

Current Letting Date: 1/28/2011<br />

Construction Season: Spring 2011<br />

Estimated Substantial Completion: Fall 2011<br />

Project History:<br />

PROJECT SUMMARY<br />

I 35<br />

North of Hinckley to South of Sandstone (North &South Bound)<br />

<strong>State</strong> Project No. 5880-177<br />

This section of Interstate 35 carries an average of<br />

16,700 vehicles per day, approximately 7% of<br />

which are classified as heavy commercial<br />

vehicles. Pavement modeling (based on current<br />

ride quality conditions, existing pavement type,<br />

and traffic levels) indicates this section of road will<br />

need pavement preservation to improve its ride<br />

quality and thereby extend its useful life.<br />

Project Benefits:<br />

Improved ride quality for road users, extend useful<br />

life<br />

Project Risks:<br />

The scope and location of this project has been<br />

changed from Bituminous overlay to unbonded<br />

concrete overlay reducing the risks of fluctuating<br />

Bituminous prices but a price spike in concrete is<br />

still a valid risk.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Project Description:<br />

Project begins 1.8 Miles south of the north<br />

Pine County Line and continues north to 2.6<br />

Miles south of Carlton County Road 4. All<br />

13.2 Miles of southbound lanes will be<br />

preserved with an unbonded concrete<br />

overlay. 4.5 Miles of the north lanes will be<br />

preserved with an unbonded concrete<br />

overlay. Traffic will be reduced to two-lanes<br />

during construction. Access to Barnum and<br />

Highway 73 at Moose Lake will be provided<br />

during construction.<br />

Aitkin<br />

Kanabec<br />

83<br />

Brook Park<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

13<br />

34<br />

85<br />

84<br />

20<br />

2<br />

23<br />

25<br />

3<br />

30<br />

21<br />

29<br />

38<br />

143<br />

140<br />

36<br />

131<br />

26<br />

17<br />

41<br />

17<br />

156<br />

18<br />

150<br />

28<br />

54<br />

40<br />

Denham<br />

27<br />

140<br />

39<br />

Finlayson<br />

61<br />

140<br />

35<br />

151<br />

Hinkley<br />

Hinkley<br />

133<br />

61<br />

134<br />

9782<br />

144<br />

16<br />

133<br />

42<br />

34<br />

Willow River<br />

Rutledge<br />

Pine<br />

5718<br />

Sandstone<br />

15<br />

52<br />

129<br />

12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 16.5<br />

$ 11.3<br />

Other Construction Elements: $ 1.1<br />

$ 0.6<br />

Engineering: $ 3.5<br />

$ 2.3<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 21.2 $ 14.1<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Recent Changes and Updates:<br />

The scope and project limit changes required more time to develop it and hence caused the<br />

delay from initially mentioned Let date. The change from bituminous overlay to unbonded<br />

concrete reduced the costs of the project significantly.<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2700<br />

District Engineer: Michael Robinson<br />

Project Manager: Todd Campbell<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

61<br />

29<br />

20<br />

152<br />

33<br />

Askov<br />

142<br />

19<br />

21<br />

43<br />

145<br />

149<br />

30<br />

136<br />

32<br />

Bruno<br />

Page A6<br />

22