17.08.2013 Views

RPT - ONE PAGERS - Minnesota State Legislature

RPT - ONE PAGERS - Minnesota State Legislature

RPT - ONE PAGERS - Minnesota State Legislature

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Schedule:<br />

Environmental Document Approval Date: Pending Approval<br />

Municipal Consent Approval Date: Not Needed<br />

Geometric Layout Approval Date:<br />

Construction Limits Established Date: Pending Approval<br />

Original Letting Date: 9/23/2011<br />

Current Letting Date: 9/23/2011<br />

Construction Season: Fall 2011<br />

Estimated Substantial Completion: Fall 2012<br />

Project History:<br />

This section of Interstate 35 carries an average of<br />

16,700 vehicles per day, approximately 7% of<br />

which are classified as heavy commercial<br />

vehicles. Pavement modeling (based on current<br />

ride quality conditions, existing pavement type,<br />

and traffic levels) indicates this section of road will<br />

need pavement preservation to improve its ride<br />

quality and thereby extend its useful life.<br />

Project Benefits:<br />

Improved ride quality for road users, extend useful<br />

life<br />

Project Risks:<br />

The scope and location of this project has been<br />

changed and now only involves an unbonded<br />

concrete overlay. The only risk would involve a<br />

spike in concrete prices.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

I 35<br />

Sandstone to Rutledge (North and South Bound)<br />

Bridge 91099<br />

<strong>State</strong> Project No. 5880-173<br />

Project Description:<br />

The project is located between Sandstone<br />

and Rutledge on I-35. It includes an<br />

unbonded concrete overlay, bridge and<br />

drainage repairs, and safety improvements.<br />

!(<br />

¹<br />

?Á@<br />

§¨`<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Rutledge<br />

!(<br />

Sandstone<br />

!(<br />

12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 13.0<br />

$ 24.1<br />

Other Construction Elements: $ 0.7<br />

$ 1.0<br />

Engineering: $ 2.6<br />

$ 4.8<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 16.3 $ 29.9<br />

§¨`<br />

?¼A@<br />

Askov<br />

!(<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Project scope has been changed from a thick bituminous overlay to an unbonded conrete<br />

overlay. A formal STIP amendment will be done to document the scope change and the<br />

cost increase.<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 1<br />

1123 Mesaba Ave<br />

(218) 725-2700<br />

District Engineer: Michael Robinson<br />

Project Manager: Todd Campbell<br />

Original date of Posting:<br />

Revised Date: 1/15/2011<br />

Page A8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!