Schedule:<br />
Environmental Document Approval Date: 08/01/2009<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date: 01/31/2009<br />
Original Letting Date: 04/22/2011<br />
Current Letting Date: 10/23/2009<br />
Construction Season: May-October 2010<br />
Estimated Substantial Completion: 08/01/2010<br />
Project History:<br />
Project was programmed because PSR and PQI<br />
have met their need year and the Suffency Rating<br />
will meet the need in 2009. At that time all values<br />
will be below the rehab trigger of 2.6.<br />
Replacement of Bridge 5481, although outside of<br />
the project limits, was included in the scoping due<br />
to low load rating of HS-15, problems with fill<br />
behind the abutment and to take advantage of the<br />
project detour. Year built 1936, NBI deck rating =<br />
5, NBI structural rating = 6, sufficiency rating =<br />
80.6.<br />
Project Benefits:<br />
Improve ride, eliminate all pavement distress,<br />
reclaim will provide stronger base course, use of<br />
polymer-modified asphalt will retard future<br />
cracking, reduce maintenance costs, improve<br />
hydraulics.<br />
Project Risks:<br />
New construction procedure in test section areas.<br />
Amendment produced and added in short time<br />
frame may have errors.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 55<br />
West Douglas County Line to Glenwood<br />
Bridge 5481<br />
<strong>State</strong> Project No. 2107-09, (6107-11)<br />
SUBSTANTIALLY COMPLETE<br />
Project Description:<br />
(2107-09 - 6107-11) Mill bituminous 4",<br />
reclaim 8", pave 5", culvert replacements,<br />
replace Bridge 5481 (associated work)<br />
October 2009<br />
10<br />
38<br />
5<br />
Grant<br />
Stevens<br />
64<br />
47<br />
37<br />
20<br />
2<br />
51<br />
54<br />
36 56<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
3<br />
25<br />
1<br />
73<br />
75<br />
26<br />
82<br />
55<br />
99<br />
107<br />
24<br />
14<br />
96<br />
97<br />
72<br />
81<br />
7<br />
27<br />
57<br />
56<br />
8<br />
Douglas<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 11.6<br />
$ 8.1<br />
Other Construction Elements: $ 1.3<br />
$ 1.1<br />
Engineering: $ 2.6<br />
$ 2.6<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 15.5 $ 11.8<br />
Recent Changes and Updates:<br />
Costs based on Let costs<br />
Key Cost Estimate Assumptions:<br />
57<br />
3<br />
1<br />
36<br />
1<br />
53<br />
1<br />
5<br />
8<br />
51<br />
32<br />
3<br />
99<br />
2<br />
56<br />
103<br />
98<br />
5<br />
1<br />
15<br />
15<br />
11<br />
56<br />
79<br />
7<br />
155<br />
28<br />
94<br />
26<br />
93<br />
Pope<br />
41<br />
52<br />
74<br />
82<br />
16<br />
4<br />
12<br />
89<br />
13<br />
40<br />
18<br />
91<br />
76<br />
31<br />
28<br />
22<br />
15<br />
6<br />
21<br />
17<br />
16<br />
78<br />
15<br />
61<br />
45<br />
54<br />
19<br />
34<br />
104<br />
90<br />
88<br />
50<br />
11<br />
44<br />
21<br />
80<br />
87<br />
46<br />
4<br />
70<br />
43<br />
106<br />
157<br />
87<br />
30<br />
35<br />
42<br />
86<br />
18<br />
23<br />
120<br />
111<br />
23<br />
85<br />
28 81<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 4<br />
1000 Hwy 10 W<br />
(218) 846-3600<br />
District Engineer: Lee Berget<br />
Project Manager: Lori Vanerhider/Seth Ylini<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
73<br />
25<br />
22<br />
Page D3