Schedule:<br />

Environmental Document Approval Date: Needed<br />

Municipal Consent Approval Date: Need Unknown<br />

Geometric Layout Approval Date: Need Unknown<br />

Construction Limits Established Date: Need Unknown<br />

Original Letting Date:<br />

Current Letting Date: 2/22/2013<br />

Construction Season: 2013<br />

Estimated Substantial Completion:<br />

Project History:<br />

The need for this project isto improve deteriorated<br />

pavement and deteriorated sub surface utilities.<br />

Also, access improvements and safety<br />

improvements at intersections are needed.<br />

Project Benefits:<br />

To provide a smooth ride, improve safety, replace<br />

failing substructure and extend pavement life.<br />

Project Risks:<br />

PROJECT SUMMARY<br />

Hwy. 169<br />

Blue Earth from the S. Limits at 14th St. North to JCT CSAH 6<br />

<strong>State</strong> Project No. 2207-32<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Project Description:<br />

Reconstruction from 14 street to junction of<br />

CSAH 6, Roundbound<br />

¹<br />

§ä<br />

)y<br />

Blue Earth<br />

!(<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP: 12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 7.2<br />

Other Construction Elements: $ 0.9<br />

Engineering: $ 1.4<br />

Right of Way: $ 0.5<br />

Total: $ 11.4<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 7<br />

2151 Bassett Drive<br />

(507) 304-6100<br />

District Engineer: James Swanson<br />

Project Manager: Brett Benzkofer<br />

Original date of Posting: Jan 2011<br />

Revised Date: 1/15/2011<br />