Schedule:<br />
Environmental Document Approval Date: 02/01/2005<br />
Municipal Consent Approval Date:<br />
Geometric Layout Approval Date: Pending Approval<br />
Construction Limits Established Date:<br />
Original Letting Date: 1/1/2029;<br />
Current Letting Date: 7/9/10<br />
Construction Season: 2010 - 2013<br />
Estimated Substantial Completion: 2013<br />
Project History:<br />
Bigelow to Worthington<br />
<strong>State</strong> Project No. 5305-56, 5305-58, 5305-59<br />
http://www.dot.state.mn.us/d7/projects/hwy60/index.html<br />
Existing road constructed in 1930s, corridor was<br />
identified for four-lane expansion in the 1960s, last<br />
segment of unimproved roadway between the Iowa<br />
border and the Twin Cities (via Highway 169),<br />
Environmental Impact <strong>State</strong>ment finalized route<br />
selection in 2005, funding provided by Chapter 152<br />
in 2008 legislative session<br />
Project Benefits:<br />
Provides continuity between adjacent 4-lane<br />
sections, improves safety with 4-lane divided<br />
design and removing skew at intersections,<br />
increases highway capacity<br />
Project Risks:<br />
Potential for substantial muck removal, possibility<br />
of contaminated soil in Mn/DOT R/W by Ruder<br />
Dump, settlements for business impacts, East<br />
Acres Trailer Park relocations, Union Pacific<br />
railroad bridge<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 60<br />
Project Description:<br />
Construct 4-lane expressway along existing<br />
alignment from Nobles County Highway 4 to<br />
Interstate 90, reduce access locations,<br />
remove skew at intersections, replace Union<br />
Pacific Railroad bridge<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Recent Changes and Updates:<br />
Bigelow<br />
2<br />
24<br />
12<br />
35<br />
6<br />
25<br />
7<br />
10<br />
52<br />
Worthington<br />
4<br />
Nobles<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 91.1<br />
$ 71.4<br />
Other Construction Elements: $ 17.5<br />
$ 13.5<br />
Engineering: $ 19.3<br />
$ 13.0<br />
Right of Way: $ 22.7<br />
$ 19.0<br />
Total: $ 150.6 $ 116.9<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Phase I, Final Plans being done; Phase 2, Final Plans just beginning; Phase 3, Layouts<br />
being done by consultant, including UP Rail Bridge<br />
Key Cost Estimate Assumptions:<br />
Cost estimates are adjusted to midpoint of construction year assuming 5% annual inflation,<br />
muck removal estimates are conservative, contaminated soil, if in Mn/DOT R/W by dump,<br />
assumed 5' depth across 50'<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 7<br />
2151 Bassett Drive<br />
(507) 304-6100<br />
District Engineer: James Swanson<br />
Project Manager: Rolin Sinn<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />