Schedule:<br />

Environmental Document Approval Date: 02/01/2005<br />

Municipal Consent Approval Date:<br />

Geometric Layout Approval Date: Pending Approval<br />

Construction Limits Established Date:<br />

Original Letting Date: 1/1/2029;<br />

Current Letting Date: 7/9/10<br />

Construction Season: 2010 - 2013<br />

Estimated Substantial Completion: 2013<br />

Project History:<br />

Bigelow to Worthington<br />

<strong>State</strong> Project No. 5305-56, 5305-58, 5305-59<br />

http://www.dot.state.mn.us/d7/projects/hwy60/index.html<br />

Existing road constructed in 1930s, corridor was<br />

identified for four-lane expansion in the 1960s, last<br />

segment of unimproved roadway between the Iowa<br />

border and the Twin Cities (via Highway 169),<br />

Environmental Impact <strong>State</strong>ment finalized route<br />

selection in 2005, funding provided by Chapter 152<br />

in 2008 legislative session<br />

Project Benefits:<br />

Provides continuity between adjacent 4-lane<br />

sections, improves safety with 4-lane divided<br />

design and removing skew at intersections,<br />

increases highway capacity<br />

Project Risks:<br />

Potential for substantial muck removal, possibility<br />

of contaminated soil in Mn/DOT R/W by Ruder<br />

Dump, settlements for business impacts, East<br />

Acres Trailer Park relocations, Union Pacific<br />

railroad bridge<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 60<br />

Project Description:<br />

Construct 4-lane expressway along existing<br />

alignment from Nobles County Highway 4 to<br />

Interstate 90, reduce access locations,<br />

remove skew at intersections, replace Union<br />

Pacific Railroad bridge<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

Bigelow<br />

2<br />

24<br />

12<br />

35<br />

6<br />

25<br />

7<br />

10<br />

52<br />

Worthington<br />

4<br />

Nobles<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 91.1<br />

$ 71.4<br />

Other Construction Elements: $ 17.5<br />

$ 13.5<br />

Engineering: $ 19.3<br />

$ 13.0<br />

Right of Way: $ 22.7<br />

$ 19.0<br />

Total: $ 150.6 $ 116.9<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Phase I, Final Plans being done; Phase 2, Final Plans just beginning; Phase 3, Layouts<br />

being done by consultant, including UP Rail Bridge<br />

Key Cost Estimate Assumptions:<br />

Cost estimates are adjusted to midpoint of construction year assuming 5% annual inflation,<br />

muck removal estimates are conservative, contaminated soil, if in Mn/DOT R/W by dump,<br />

assumed 5' depth across 50'<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 7<br />

2151 Bassett Drive<br />

(507) 304-6100<br />

District Engineer: James Swanson<br />

Project Manager: Rolin Sinn<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

57<br />

33<br />

5<br />

5<br />

5<br />

35<br />

3<br />

36<br />

53<br />

Page F7