Schedule:<br />
Split Rock River to Chapins Curve<br />
<strong>State</strong> Project No. 3806-60<br />
http://www.dot.state.mn.us/d1/projects/hwy61_split_rock/index.html<br />
Environmental Document Approval Date: 12/4/2009<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: 09/21/2008<br />
Construction Limits Established Date: 07/02/2008<br />
Original Letting Date: 11/23/2001<br />
Current Letting Date: 02/12/2010<br />
Construction Season: 2010/2011<br />
Estimated Substantial Completion: Fall 2011<br />
Project History:<br />
The Hwy. 61 Rehabilitation Project includes<br />
reconstruction of 3.4 Miles of Hwy. 61 in Lake<br />
County to improve highway safety by correcting<br />
existing design issues such as substandard<br />
horizontal curves, poor sight distance, narrow<br />
shoulders, steep in-slopes, and clear zone<br />
obstructions along the corridor. The<br />
reconstruction of Hwy. 61 will also reduce<br />
maintenance costs by replacing a deteriorating<br />
road core with a new structurally sound road core.<br />
Bicycle/pedestrian accessibility has been<br />
addressed by the addition of a bicycle/pedestrian<br />
underpass that connects the wayside rest just<br />
south of the Split Rock River to the existing<br />
bicycle/pedestrian trail.<br />
Project Benefits:<br />
Improved highway safety, increased sight<br />
distance, reduced maintenance costs, bike/ped<br />
accessibility<br />
Project Risks:<br />
If actual elevation of bed rock varies from the rock<br />
lines used for computation of quantities, the<br />
project costs could change significantly<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 61<br />
Project Description:<br />
Reconstruct 3.5 miles of Hwy. 61, construct<br />
bicycle/pedestrian underpass, construct a<br />
Bridge to replace existing box culvert<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Recent Changes and Updates:<br />
The project is now let and is under construction.<br />
Key Cost Estimate Assumptions:<br />
3<br />
Lake<br />
15<br />
402<br />
4<br />
5<br />
Beaver Bay<br />
Lake Superior<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 14.4<br />
$ 10.8<br />
Other Construction Elements: $ 0.6<br />
$ 0.4<br />
Engineering: $ 2.9<br />
$ 2.2<br />
Right of Way: $ 1.6<br />
$ 2.3<br />
Total: $ 19.5 $ 15.7<br />
107<br />
Silver Bay<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2700<br />
District Engineer: Michael Robinson<br />
Project Manager: Todd Campbell<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
Page A13