Schedule:<br />
Environmental Document Approval Date: 1/5/2010<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date:<br />
Original Letting Date: 01/28/2011<br />
Current Letting Date: 12/17/2010<br />
Construction Season: 2011<br />
Estimated Substantial Completion: Aug-11<br />
Project History:<br />
Interstate 90 concrete surface was constructed in<br />
1971.<br />
Project Benefits:<br />
Improve ride quality, reduce maintenance costs,<br />
replace or repair drainage, replace or repair<br />
appurtenances.<br />
Project Risks:<br />
Traffic will be moved to westbound lanes.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
I 90<br />
Hwy. 43 to Hwy. 76 (Eastbound Lane)<br />
<strong>State</strong> Project No. 8580-152<br />
SUBSTANTIALLY COMPLETE<br />
Project Description:<br />
Add unbonded concrete overlay to the<br />
existing roadway.<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
2<br />
25<br />
20<br />
25<br />
110<br />
23<br />
Stockton<br />
Fillmore<br />
Rushford Village<br />
Rushford<br />
Goodview<br />
12<br />
21<br />
102 4<br />
Traffic is assumed to utilize temporary crossovers during construction.<br />
44<br />
Winona<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 12.1<br />
$ 10.3<br />
Other Construction Elements: $ 0.0<br />
$ 0.0<br />
Engineering: $ 1.0<br />
$ 1.0<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 13.1 $ 11.3<br />
19<br />
32<br />
Winona<br />
105<br />
Houston<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 6<br />
2900 48th Street NW<br />
(507) 286-7500<br />
District Engineer: Nelrae Succio<br />
Project Manager: Jake Rezac<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
17<br />
15<br />
17<br />
15<br />
9<br />
26 13<br />
Page E10<br />