Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date: Not Needed<br />
Original Letting Date: 11/17/2017<br />
Current Letting Date: 11/20/2015<br />
Construction Season: 2016<br />
Estimated Substantial Completion: 09/01/2016<br />
Project History:<br />
The expectation of this project is that Bridge 9090<br />
will be rehabilitated to address some of its<br />
currently deficient features. This structure was<br />
built in 1963 and is still very structurally sound.<br />
Pier repairs, pigeon abatement, a new paint<br />
system and a new deck will all be a part of this<br />
project.<br />
Project Benefits:<br />
Replace current lead based paint system with a<br />
new, more environmentally friendly one, improve<br />
pigeon abatement entities to increase safety to<br />
bridge workers and facilitate easier inspection of<br />
critical members, improve ride quality<br />
Project Risks:<br />
Need to coordinate project scheduling with<br />
emergency services, schools and transit, pier on<br />
ND side may need to be replaced if their project to<br />
stabilities it in 2010 is unsuccessful, several<br />
agencies involved in decision-making/approval<br />
process<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 2<br />
Kennedy Bridge in East Grand Forks (Kennedy)<br />
Bridge 9090<br />
<strong>State</strong> Project No. 6018-02<br />
Project Description:<br />
Rehabilitate existing Bridge 9090 including<br />
enhanced pigeon abatement, new paint<br />
system and new bridge deck.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
Polk<br />
2<br />
RED R<br />
East Grand Forks<br />
Prior to the Chapter 152 funding, a bridge painting project was programmed for 2009. With<br />
the addition of this additional funding, more extensive rehabilitation work is now<br />
programmed for 2016 to include painting, deck and pier rehabilitation.<br />
Key Cost Estimate Assumptions:<br />
Baseline Est. Current Est.<br />
9.0<br />
0.0<br />
2.4<br />
0.0<br />
Total: $ 11.4 - $<br />
Structure life and integrity of its members will be enhanced considerably by this work.<br />
$<br />
$<br />
$<br />
$<br />
- $<br />
- $<br />
- $<br />
- $<br />
15.0<br />
0.0<br />
2.4<br />
0.0<br />
17.4<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 2<br />
3920 Highway 2 West<br />
(218) 755-6500<br />
District Engineer: Lynn C. Eaton<br />
Project Manager: J.T. Anderson<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
Page B4