Schedule:<br />
Environmental Document Approval Date: 04/05/2006<br />
Municipal Consent Approval Date: 10/07/2008<br />
Geometric Layout Approval Date: ND Lead Agency<br />
Construction Limits Established Date: 04/13/2006<br />
Original Letting Date: 05/01/2007<br />
Current Letting Date: 11/21/2008<br />
Construction Season: 2009-2010<br />
Estimated Substantial Completion: 08/01/2011<br />
Project History:<br />
PROJECT SUMMARY<br />
Hwy. 11<br />
West of Robbin-Robbin/Drayton Bridge (Robbin/Drayton)<br />
This project is located on the border of <strong>Minnesota</strong><br />
and North Dakota and involves the replacement of<br />
Mn/DOT Bridge 6690 over the Red River of the<br />
North. This project will also include re-grading and<br />
realignment of the bridge approach. North Dakota<br />
is the lead agency for this project.<br />
Project Benefits:<br />
Bridge extension on the North Dakota side will<br />
eliminate/alleviate flooding at the bridge<br />
approach. The design will allow the approach<br />
elevation to be raised without raising the flood<br />
stage behind the bridge. Ensure the continued<br />
flow of traffic at this <strong>Minnesota</strong>/North Dakota<br />
border crossing which is critical to the agricultural<br />
manufacturing businesses in the region.<br />
Project Risks:<br />
Because this project has been let - the risks<br />
identified during the project scoping and design<br />
phases are yet to be realized.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Bridge 6690<br />
<strong>State</strong> Project No. 3501-13<br />
SUBSTANTIALLY COMPLETE<br />
Project Description:<br />
Replace MnDOT Bridge 6690 over the Red<br />
River of the North at the Robbin/Drayton<br />
<strong>Minnesota</strong>/North Dakota border crossing.<br />
This project will also include regrading<br />
realignment of the bridge approach.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Recent Changes and Updates:<br />
RED R<br />
Kittson<br />
Marshall<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 13.5<br />
$ 13.5<br />
Other Construction Elements: $ 0.0<br />
$ 0.2<br />
Engineering: $ 0.0<br />
$ 1.0<br />
Right of Way: $ 0.1<br />
$ 0.1<br />
Total: $ 13.6 $ 14.8<br />
Kennedy<br />
Donaldson<br />
Stephen<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Additional project development time was needed by the <strong>State</strong> of North Dakota, who did the<br />
project design and letting.<br />
Key Cost Estimate Assumptions:<br />
Continued flow of traffic at this crucial <strong>Minnesota</strong>/North Dakota border crossing of which<br />
promotes commerce in the region<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 2<br />
3920 Highway 2 West<br />
(218) 755-6500<br />
District Engineer: Lynn C. Eaton<br />
Project Manager: Roger Hille<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
Page B5