Schedule:<br />
Environmental Document Approval Date: 09/25/2008<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: 03/18/1997<br />
Construction Limits Established Date: 06/12/2001<br />
Original Letting Date: 12/20/1996<br />
Current Letting Date: 02/27/2009<br />
Construction Season: 2009/2010<br />
Estimated Substantial Completion: Fall 2010<br />
Project History:<br />
The Hwy. 61 Rehabilitation Project includes<br />
reconstruction of 3.5 miles of Hwy. 61 in Cook<br />
County to improve highway safety by correcting<br />
existing design issues such as narrow shoulders,<br />
steep in-slopes, and clear zone obstructions along<br />
the corridor. The reconstruction of Hwy. 61 will<br />
also reduce maintenance costs by replacing a<br />
deteriorating road core with a new structurally<br />
sound road core. Due to funding limitations the<br />
project was put on hold in the late 1990s. Since<br />
then, several issues have surfaced that needed to<br />
be addressed before proceeding with the letting f<br />
this project. Bicycle/pedestrian accessibility has<br />
been addressed by the addition of a bike/ped trail<br />
adjacent to the highway on the lake side. A<br />
bike/ped underpass will be constructed at the<br />
northeast terminus of the project near the County<br />
Road 34 connection. Fish passage concerns at<br />
the Onion River have been addressed by restoring<br />
the Onion River to a natural bottom crossing and<br />
constructing a bridge to carry the highway over the<br />
river.<br />
Project Benefits:<br />
Improved highway safety, reduced maintenance<br />
costs, bicycle/pedestrian accessibility, ensures fish<br />
passage at Onion River for spawning of Coaster<br />
Brook Trout<br />
Project Risks:<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 61<br />
2.7 miles to 6.2 miles north of Tofte<br />
<strong>State</strong> Project No. 1601-48<br />
SUBSTANTIALLY COMPLETE<br />
Project Description:<br />
Reconstruct 3.5 miles of Hwy 61, construct<br />
approximately 3.5 miles of bicycle/pedestrian<br />
trail, construct bicycle/pedestrian underpass,<br />
construct bridge at Onion River<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 15.0<br />
$ 12.2<br />
Other Construction Elements: $ 0.0<br />
$ 0.5<br />
Engineering: $ 2.9<br />
$ 2.4<br />
Right of Way: $ 1.3<br />
$ 1.3<br />
Recent Changes and Updates:<br />
Project is under construction; Cost estimate reduced due to bid results. This project was<br />
deferred indefinitely when it became apparent that the district would no longer be able to<br />
fund reconstruction projects in the Highway 61 corridor with regular porgram dollars due to<br />
the extremely high costs. Project eventually received High Priority Project funding was able<br />
to be let.<br />
Key Cost Estimate Assumptions:<br />
Cook<br />
Total: $ 19.2 $ 16.4<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2700<br />
District Engineer: Michael Robinson<br />
Project Manager: Todd Campbell<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
79<br />
34<br />
Page A12