Schedule:<br />
Environmental Document Approval Date: 10/11/2010<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Pending Approval<br />
Construction Limits Established Date: Assume no R/W need<br />
Original Letting Date: 11/20/2009<br />
Current Letting Date: 1/28/2011<br />
Construction Season: Spring 2011<br />
Estimated Substantial Completion: Fall 2011<br />
Project History:<br />
This section of Interstate 35 carries an average of<br />
15,900 vehicles per day, approximately 7% of<br />
which are classified as heavy commercial<br />
vehicles. Pavement modeling (based on current<br />
ride quality conditions, existing pavement type,<br />
and traffic levels) indicates this section of road will<br />
need pavement preservation to improve its ride<br />
quality and thereby extend its useful life.<br />
Project Benefits:<br />
Improved ride quality for road users, extend useful<br />
life<br />
Project Risks:<br />
Cross slope correction quantities are not<br />
determined until 90% design stage and could<br />
increase final concrete quantity estimates<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
I 35<br />
North of Sturgeon Lake to south of Mahtowa<br />
<strong>State</strong> Project No. 0980-138<br />
Project Description:<br />
Project begins 1.8 Miles south of the north<br />
Pine County Line and continues north to 2.6<br />
Miles south of Carlton County Road 4. All<br />
13.2 Miles of southbound lanes will be<br />
preserved with an unbonded concrete<br />
overlay. 4.5 Miles of the north lanes will be<br />
preserved with an unbonded concrete<br />
overlay. Traffic will be reduced to two-lanes<br />
during construction. Access to Barnum and<br />
Highway 73 at Moose Lake will be provided<br />
during construction.<br />
132<br />
134<br />
46<br />
160<br />
12<br />
Sturgeon Lake<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Recent Changes and Updates:<br />
61<br />
161<br />
167<br />
51<br />
35<br />
15<br />
Moose Lake<br />
12/21/2010<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 26.2<br />
$ 17.2<br />
Other Construction Elements: $ 1.7<br />
$ 0.9<br />
Engineering: $ 5.6<br />
$ 3.6<br />
Right of Way: $ 1.1<br />
$ 0.0<br />
Total: $ 33.5 $ 22.3<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
The scope changes of the projects led to the delay in Letting and considerable reduction in<br />
costs from the original estimate.<br />
Key Cost Estimate Assumptions:<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 1<br />
1123 Mesaba Ave<br />
(218) 725-2700<br />
District Engineer: Michael Robinson<br />
Project Manager: Todd Campbell<br />
Original date of Posting: Jan 2009<br />
Revised Date:<br />
46<br />
10<br />
50<br />
61<br />
137<br />
8<br />
162<br />
138<br />
13<br />
Page A9