ANNUAL REPORT ON MAJOR HIGHWAY PROJECTS<br />

JANUARY 15, 2010<br />

TPCE (Total<br />

Project Cost Construction See<br />

District<br />

<strong>State</strong> Project<br />

No. Route Project Location Project Description<br />

Projected Year of<br />

Construction<br />

Estimates)<br />

(Millions)<br />

Letting Cost<br />

(Millions)<br />

Also<br />

Page<br />

M 2781-415 I 94 Lowry Hill Tunnel to John Ireland Boulevard Mill and Overlay and develop a managed corridor using<br />

2011 $55.0 $50.0 H12<br />

2781-443<br />

2781-443<br />

advance traffic technology.<br />

M I 94 I 94 on ramp over I 94 and Highway 65 Replace Bridge 27842 and 27843, adjust horizontal and<br />

vertical alignment of westbound I 94, vertical alignment of I-94<br />

eastbound and vertical alignment of Highway 65<br />

2018 $90.0 - $110.0<br />

H13<br />

M 2734-33 Hwy. 100 36th Street to 25 1/2 Street Freeway and interchange reconstruction, replace Bridges<br />

5308, 5309, 5462, and 5598, grading surfacing, drainage,<br />

utilities, noise and retaining walls, TMC<br />

2016-2018 $80.0<br />

H14<br />

M 2750-57 Hwy. 169 At County Road 81 and County Road 109 Build Highway 169 over the top of County Road 81, County<br />

Road 109 and Burlington Northern Santa Fe railroad tracks,<br />

diamond interchange at County Road 109<br />

July-08 - July-11 $58.6 $50.0 H15<br />

M 2760 Hwy. 169 At 93rd Street in Brooklyn Park Convert Intersection into a new interchange 2012-2013 $23.0<br />

H16<br />

M 2771-37 Hwy. 610 New alignment from County Road 81 (Elm This project is to continue the construction of Hwy. 610. It will 2020-2025 $135.0 - $175.0<br />

H17<br />

Creek Blvd.)to I-94 in Maple Grove and extend a four-lane freeway section from Hennepin County<br />

Brooklyn Park.<br />

Road 81 to I 94 in Maple Grove on new alignment.<br />

M 8285-93 I 494 Lake Road to I-94 Bituminous widening, temporary bypass construction, widen 2009-2010 $21.3<br />

H18<br />

8285-94<br />

Bridge 9775, majority of new drainage and project grading,<br />

unbonded concrete overlay, pave shoulders, guardrail, median<br />

barrier, impact attenuators<br />

M 2785-367<br />

2785-364<br />

I-494 34th Ave to France Ave Mill & Overlay, construct WB Aux lane from Penn Ave to NB<br />

TH 100,. Replace Xerxes Ave Bridge<br />

2013 $35.0 - $45.0<br />

H19<br />

M<br />

2785-378<br />

2771-38 Hwy. 610 New alignment Hwy. 169 to Hennepin This project is to continue the construction of Hwy. 610. It will 2009-2011 $49.8 $47.8 H20<br />

County Road 81 (Elm Creek Blvd)<br />

extend a four-lane freeway section from Hwy. 169 to Hennepin<br />

County Road 81 on new alignment.<br />

M 2776-03 Hwy. 169 / I Interchange Remove three signals, connect north and south frontage roads Nov 10 - Nov 12 $170.0 $125.2 H21<br />

494<br />

under Highway 169, convert expressway to freeway, construct<br />

noise barriers/visual barriers, construct drainage and water<br />

quality facilities<br />

M 8286-64 I 694 I-94 to 40th Street Bridge Concrete overlay, 4 bridge deck replacements, and 2 bridge<br />

repairs<br />

2010 $13.2 $13.2 H22<br />

M 6285-135 I-694 From Lexington Avenue to west of Old Replace bridges, add one lane in each direction on I-694,<br />

2011-2013 $70.6<br />

H23<br />

Highway 10<br />

remove weave section between TH 10 and I-694, etc.<br />

Questions about information contained in this report should be directed to Mn/DOT Office of Investment Management and Performance Measure Page 15