Schedule:<br />
Environmental Document Approval Date: Need Unknown<br />
Municipal Consent Approval Date: Need Unknown<br />
Geometric Layout Approval Date: Need Unknown<br />
Construction Limits Established Date:<br />
Original Letting Date: 1/1/2014<br />
Current Letting Date: 3/22/2013<br />
Construction Season: 2013-2014<br />
Estimated Substantial Completion: 2014<br />
Project History:<br />
PROJECT SUMMARY<br />
Hwy. 99<br />
Bridge over <strong>Minnesota</strong> River in St. Peter (St. Peter Bridge)<br />
Built in 1931, Bridge 4930 is a steel truss bridge<br />
over the <strong>Minnesota</strong> River on the east side of St.<br />
Peter. This bridge is on the National Register of<br />
Historic Places and is one of the 24 bridges<br />
selected across the state of <strong>Minnesota</strong> for special<br />
preservation. Bridge 4930 is a fracture critical<br />
bridge located in the 100-year flood elevation with<br />
corrosion in the steel members and deterioration<br />
of concrete in the bearing support and parapet<br />
wall. It has a sufficiency rating of 56 and was last<br />
inspected on September 4, 2008. Some repairs<br />
and rehabilitation have taken place in the 1950s,<br />
1960s and 1980s.<br />
Project Benefits:<br />
Provides a safe crossing of the <strong>Minnesota</strong> River,<br />
creates load path redundancy, improves drainage,<br />
preserves the historic Bridge 4930<br />
Project Risks:<br />
Addressing the fracture critical requirements while<br />
preserving the historical nature and appearance of<br />
the bridge, foundation and scouring issues,<br />
reconstructing abutment around existing storm<br />
tunnel, raising the bridge to allow for more<br />
waterway opening, adding more piers in the river,<br />
if a new bridge is built, flooding during construction<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Bridge 4930<br />
<strong>State</strong> Project No. 4008-25<br />
Project Description:<br />
Alternative 1: Rehabilitation of Bridge 4930<br />
in-place. Alternative 2: New bridge on<br />
existing alignment with rehabilitation and<br />
relocation of Bridge 4930 to serve as a trail<br />
crossing for the City of St. Peter.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
40<br />
15<br />
5<br />
51<br />
20<br />
Nicollet<br />
21<br />
74<br />
Kasota<br />
Saint Peter<br />
41<br />
45<br />
102<br />
102<br />
MINNESOTA R<br />
4930<br />
102<br />
23<br />
Le Sueur<br />
Historic Bridge under review. The costs estimate are based on the replacement for the<br />
current Bridge but the repair costs may be substantially less.<br />
Key Cost Estimate Assumptions:<br />
Baseline Est. Current Est.<br />
27.3<br />
8.9<br />
5.5<br />
2.5<br />
Total: $ 44.2 - $<br />
Cost estimate is from the Cost Risk Assessment/Value Engineering workshop held on<br />
November 3, 2008. The 90% probability of the most expensive alternative (Alternative 2)<br />
was used.<br />
$<br />
$<br />
$<br />
$<br />
- $<br />
- $<br />
- $<br />
- $<br />
107<br />
18<br />
32.7<br />
9.1<br />
6.5<br />
2.6<br />
50.8<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 7<br />
2151 Bassett Drive<br />
(507) 304-6100<br />
District Engineer: James Swanson<br />
Project Manager: Brett Benzkofer<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
110<br />
20<br />
19<br />
109<br />
Page F9