Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date: Pending Approval<br />
Geometric Layout Approval Date: Pending Approval<br />
Construction Limits Established Date: Pending Approval<br />
Original Letting Date: 11/01/2015<br />
Current Letting Date: 11/17/2017<br />
Construction Season: 2018-2019<br />
Estimated Substantial Completion: 08/01/2019<br />
Project History:<br />
Rehabilitate or replace Mn/DOT Bridge 4700 over<br />
the Red River between <strong>Minnesota</strong> and North<br />
Dakota. Completed bridge will include improved<br />
access for pedestrians and bicyclists. If a new<br />
bridge is constructed the length and alignment will<br />
need to closely match the existing conditions due<br />
to proximity of downtown businesses and in-place<br />
flood protection facilities. The existing bridge is<br />
600 feet long.<br />
Project Benefits:<br />
Upgrading or replacement of a fracture critical<br />
structure will provide continued inter-state access<br />
in a metropolitan area.<br />
Project Risks:<br />
Need to coordinate project scheduling with<br />
emergency services, schools and transit. Bridge<br />
4700 is one of 24 historic bridges Mn/DOT has<br />
committed to the FHWA to preserve. Proximity to<br />
downtown business and inplace flood protection<br />
limits bridge profile. Seasonal flooding of Red<br />
River may provide construction difficulties.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 2<br />
US 2B over Red River in East Grand Forks (Sorlie)<br />
Bridge 4700<br />
<strong>State</strong> Project No. 6015-07<br />
Project Description:<br />
Remove and replace bridge 4700 with new<br />
structurally redundant bridge. Bridge will<br />
include improved access for pedestrians and<br />
bicyclists. Current bridge length is<br />
approximately 600 feet, new bridge length<br />
will be very similar due to proximity of<br />
downtown.<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
9090<br />
RED R<br />
4700<br />
East Grand Forks<br />
Polk<br />
North Dakota DOT is the lead agency. The district needs more time for project<br />
development because the bridge is a historic structure and the alternative of rehabilitation<br />
instead of replacement requires more evaluation time.<br />
Key Cost Estimate Assumptions:<br />
Baseline Est. Current Est.<br />
29.0<br />
6.0<br />
9.5<br />
1.4<br />
Total: $ 45.9 - $<br />
Safety will be improved as a result of eliminating the current fracture critical structure,<br />
pedestrian/bicycle access will be improved<br />
$<br />
$<br />
$<br />
$<br />
- $<br />
- $<br />
- $<br />
- $<br />
50.6<br />
0.0<br />
9.5<br />
1.4<br />
61.5<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 2<br />
3920 Highway 2 West<br />
(218) 755-6500<br />
District Engineer: Lynn C. Eaton<br />
Project Manager: J.T. Anderson<br />
Original date of Posting: Jan 2009<br />