Schedule:<br />
Environmental Document Approval Date: Pending Approval<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date: Not Needed<br />
Original Letting Date: 11/20/2015<br />
Current Letting Date: 11/18/2016<br />
Construction Season: 2017<br />
Estimated Substantial Completion: 11/01/2017<br />
Project History:<br />
The need for this project is a deteriorated<br />
pavement, indicated by the deteriorating pavement<br />
structure of the full depth bituminous pavement<br />
causing reduced ability to support heavy loads,<br />
rough ride, and overwhelming maintenance costs.<br />
The purpose of this project is to regain the<br />
pavement strength, improve the ride, and reduce<br />
maintenance costs.<br />
Project Benefits:<br />
Provides long term pavement serviceability for<br />
failing full depth bituminous pavement<br />
Project Risks:<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 23<br />
Cottonwood to Granite Falls<br />
<strong>State</strong> Project No. 4203-50<br />
Project Description:<br />
Mill and concrete overlay<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Construction Letting:<br />
Other Construction Elements:<br />
Engineering:<br />
Right of Way:<br />
Recent Changes and Updates:<br />
?âA@<br />
?¼A@<br />
Cottonwood<br />
!(<br />
Hanley Falls<br />
!(<br />
?ÎA@<br />
Granite Falls<br />
!(<br />
Wood Lake<br />
!(<br />
This project now includes the work formerly found under (retired) S.P. number 8701-36.<br />
Key Cost Estimate Assumptions:<br />
Baseline Est. Current Est.<br />
23.1<br />
1.9<br />
5.0<br />
0.0<br />
Total: $ 30.0 - $<br />
$<br />
$<br />
$<br />
$<br />
- $<br />
- $<br />
- $<br />
- $<br />
31.3<br />
2.5<br />
6.8<br />
0.0<br />
40.6<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 8<br />
2505 Transportation Road<br />
(320) 231-5195<br />
District Engineer: Jon Huseby<br />
Project Manager: Susan Karnowski<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
¹<br />
Page G4