Schedule:<br />

Environmental Document Approval Date: Pending Approval<br />

Municipal Consent Approval Date: Pending Approval<br />

Geometric Layout Approval Date: Pending Approval<br />

Construction Limits Established Date: Pending Approval<br />

Original Letting Date: 11/17/2017<br />

Current Letting Date: 11/17/2017<br />

Construction Season: 2018-2019<br />

Estimated Substantial Completion: 08/01/2019<br />

Project History:<br />

This Pennsylvania Steel High Truss bridge with an<br />

open grate bridge deck was constructed in 1959<br />

by the City of Baudette and operated as a toll<br />

bridge until Mn/DOT and Ontario Ministry of<br />

Transportation assumed ownership. The deck<br />

width is 26.5 feet, the main span length is 192.5<br />

feet with the structure length being 1,285 feet.<br />

Project Benefits:<br />

Upgrading or replacement of a fracture critical<br />

structure will improve geometry and traffic safety<br />

while proving continued international access.<br />

Project Risks:<br />

Possible relocation or modifications of US and<br />

Canadian Customs buildings and a transfer station<br />

which serves power to the cities of Baudette and<br />

Rainy River, Ontario, Canada. - cultural resource<br />

issues in <strong>Minnesota</strong> as well as Ontario, Canada. -<br />

international agreements will need to be developed<br />

and coordinated to enable budget and logistics<br />

planning.<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 72<br />

Rainy River Bridge in Baudette<br />

Bridge 9412<br />

<strong>State</strong> Project No. 3905-09<br />

Project Description:<br />

Rehabilitation or Replacement of Mn/DOT<br />

Bridge 9412 over the Rainy River.<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Recent Changes and Updates:<br />

73<br />

39<br />

3<br />

1<br />

5<br />

22<br />

35<br />

26<br />

27<br />

9412<br />

Baudette<br />

Lake of the Woods<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 42.0<br />

$ 42.0<br />

Other Construction Elements: $ 2.1<br />

$ 2.1<br />

Engineering: $ 8.4<br />

$ 8.4<br />

Right of Way: $ 10.0<br />

$ 10.0<br />

Total: $ 62.5 $ 62.5<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

During winter 2010/2011 a preliminary study will be done to evaluate bridge options and<br />

also evaluate rehabilitation options.<br />

Key Cost Estimate Assumptions:<br />

Safety will be improved as a result of eliminating the current fracture critical structure and<br />

improving geometry.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 2<br />

3920 Highway 2 West<br />

(218) 755-6500<br />

District Engineer: Lynn C. Eaton<br />

Project Manager: Phil Bergem<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

19<br />

Page B8