From 2.2 Miles east of Hwy. 74 to west Junction Hwy. 43 Eastbound Lanes<br />
(St. Charles-Lewiston)<br />
<strong>State</strong> Project No. 8580-156<br />
Schedule:<br />
Environmental Document Approval Date: 04/14/2009<br />
Municipal Consent Approval Date: Not Needed<br />
Geometric Layout Approval Date: Not Needed<br />
Construction Limits Established Date:<br />
Original Letting Date: 1/25/2013<br />
Current Letting Date: 2/12/2010<br />
Construction Season: 2010<br />
Estimated Substantial Completion: Fall 2010<br />
Project History:<br />
Interstate 90 concrete surface was constructed in<br />
1971.<br />
Project Benefits:<br />
Improve ride quality, reduce maintenance costs,<br />
replace or repair drainage, replace or repair<br />
appurtenances.<br />
Project Risks:<br />
Traffic will be moved to eastbound lanes.<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
I 90<br />
SUBSTANTIALLY COMPLETE<br />
Project Description:<br />
Add unbonded concrete overlay to the<br />
existing roadway.<br />
Saint Charles<br />
11<br />
43<br />
Total Project Cost Estimate (millions)<br />
Ingot Dr<br />
Iris Rd<br />
Fairwater Dr<br />
Ibex Rd<br />
305th Ave<br />
S Main St<br />
Hot Iron Dr<br />
Date in which the project entered into the STIP:<br />
E 5th St<br />
Elba<br />
Gunflint Rd<br />
Harrow Rd<br />
E Center St<br />
325th Ave<br />
Goodview Dr<br />
Grouse Rd<br />
341st Ave<br />
Fern Rd<br />
W Center Ave<br />
Altura<br />
Utica<br />
310th St<br />
Echo Rd<br />
Flag Rd<br />
290th St<br />
355th Ave<br />
Deep River Rd<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 21.7<br />
$ 15.3<br />
Other Construction Elements: $ 0.0<br />
$ 0.0<br />
Engineering: $ 1.0<br />
$ 1.0<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 22.7 $ 16.3<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
This project was advanced due to receiving bond funding.<br />
Key Cost Estimate Assumptions:<br />
Traffic is assumed to utilize temporary crossovers during construction.<br />
11<br />
21 117<br />
26<br />
119<br />
35<br />
6<br />
39<br />
6<br />
Harrow Rd<br />
108<br />
Heritage Ln<br />
Hobbit Ln<br />
37<br />
123<br />
104<br />
115<br />
113<br />
112<br />
33<br />
32<br />
111<br />
286th St<br />
Enfield Rd<br />
105<br />
114<br />
14<br />
18<br />
29<br />
381st Ave<br />
27<br />
Doe Rd<br />
109<br />
Williams St<br />
Lewiston<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 6<br />
2899 48th Street NW<br />
(507) 286-7499<br />
District Engineer: Nelrae Succio<br />
Project Manager: Jake Rezac<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
26<br />
124<br />
33<br />
31<br />
20<br />
Durango Dr<br />
25<br />
106<br />
393rd Ave<br />
340th St<br />
Vogen Rd<br />
25<br />
Rollingstone<br />
Dunn Ln<br />
Airport Dr<br />
Airport Rd<br />
25<br />
Ridgeview Rd<br />
Peterson<br />
25<br />
2<br />
110<br />
20<br />
120<br />
Rushford Village<br />
23<br />
Indian Chapel Dr<br />
Tower Ridge Rd<br />
106<br />
27<br />
<strong>Minnesota</strong> City<br />
Stockton<br />
F St<br />
Frontage Rd<br />
Tuff Ln<br />
Oian Rd<br />
102<br />
County Line Rd<br />
N Mill St<br />
Rushford<br />
Aspen Rd<br />
27<br />
Ekern Rd<br />
Winona<br />
Theurer Blvd<br />
129<br />
12<br />
Goodview<br />
4<br />
26<br />
Winona<br />
21<br />
Page E11<br />
Dump Hill Rd