Schedule:<br />

Environmental Document Approval Date: 06/01/1999<br />

Municipal Consent Approval Date: 03/01/2008<br />

Geometric Layout Approval Date: 09/07/1999<br />

Construction Limits Established Date: 02/20/2004<br />

Original Letting Date: 07/01/2005<br />

Current Letting Date: 05/02/2008<br />

Construction Season: 7/2008-6/2011<br />

Estimated Substantial Completion: 2011<br />

Project History:<br />

SP 8103-49 is the third construction stage of a<br />

four-lane expansion of Hwy 14 from Mankato to<br />

Owatonna. The design of the road will be rural,<br />

four-lane, depressed median, expressway with<br />

grade-separated overpasses and interchanges.<br />

Project Benefits:<br />

Provides continuity between adjacent four-lane<br />

section, improves safety with 4-lane divided design<br />

and removing at-grade crossings, increases<br />

highway capacity<br />

Project Risks:<br />

Severe weather conditions will cause construction<br />

delays and affect timelines<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

PROJECT SUMMARY<br />

Hwy. 14<br />

County Road 2 to Waseca-Steele County line<br />

<strong>State</strong> Project No. 8103-49<br />

http://www.dot.state.mn.us/d7/projects/14watonna<br />

Project Description:<br />

Construct 4-lane divided highway from<br />

County Hwy 2 to the Waseca/Steele County<br />

Line, realignment of Hwy 13, controlled<br />

access on new Hwy 14 alignment, construct<br />

10 new bridges<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP:<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 57.5<br />

$ 57.5<br />

Other Construction Elements: $ 11.5<br />

$ 11.5<br />

Engineering: $ 1.2<br />

$ 1.2<br />

Right of Way: $ 6.5<br />

$ 6.5<br />

Total: $ 76.7 $ 76.7<br />

Under construction<br />

68<br />

19<br />

53<br />

11<br />

17<br />

71<br />

79<br />

61<br />

29<br />

35<br />

26<br />

52<br />

2<br />

24<br />

52<br />

12<br />

76<br />

75<br />

53<br />

9<br />

27<br />

27<br />

23<br />

57<br />

73<br />

5<br />

13<br />

22<br />

Waseca<br />

Waseca Steele<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 7<br />

2151 Bassett Drive<br />

(507) 304-6100<br />

District Engineer: James Swanson<br />

Project Manager: Craig Felber<br />

Original date of Posting: Jan 2009<br />

Revised Date: 1/15/2011<br />

4<br />

51<br />

15<br />

20<br />

10<br />

5<br />

56<br />

56<br />

14<br />

16<br />

63<br />

18<br />

4<br />

18<br />

4<br />

29<br />

33<br />

32<br />

7<br />

112<br />

162<br />

18<br />

Page F4<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!