Schedule:<br />
Environmental Document Approval Date: 06/01/1999<br />
Municipal Consent Approval Date: 03/01/2008<br />
Geometric Layout Approval Date: 09/07/1999<br />
Construction Limits Established Date: 02/20/2004<br />
Original Letting Date: 07/01/2005<br />
Current Letting Date: 05/02/2008<br />
Construction Season: 7/2008-6/2011<br />
Estimated Substantial Completion: 2011<br />
Project History:<br />
SP 8103-49 is the third construction stage of a<br />
four-lane expansion of Hwy 14 from Mankato to<br />
Owatonna. The design of the road will be rural,<br />
four-lane, depressed median, expressway with<br />
grade-separated overpasses and interchanges.<br />
Project Benefits:<br />
Provides continuity between adjacent four-lane<br />
section, improves safety with 4-lane divided design<br />
and removing at-grade crossings, increases<br />
highway capacity<br />
Project Risks:<br />
Severe weather conditions will cause construction<br />
delays and affect timelines<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
PROJECT SUMMARY<br />
Hwy. 14<br />
County Road 2 to Waseca-Steele County line<br />
<strong>State</strong> Project No. 8103-49<br />
http://www.dot.state.mn.us/d7/projects/14watonna<br />
Project Description:<br />
Construct 4-lane divided highway from<br />
County Hwy 2 to the Waseca/Steele County<br />
Line, realignment of Hwy 13, controlled<br />
access on new Hwy 14 alignment, construct<br />
10 new bridges<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP:<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 57.5<br />
$ 57.5<br />
Other Construction Elements: $ 11.5<br />
$ 11.5<br />
Engineering: $ 1.2<br />
$ 1.2<br />
Right of Way: $ 6.5<br />
$ 6.5<br />
Total: $ 76.7 $ 76.7<br />
Under construction<br />
68<br />
19<br />
53<br />
11<br />
17<br />
71<br />
79<br />
61<br />
29<br />
35<br />
26<br />
52<br />
2<br />
24<br />
52<br />
12<br />
76<br />
75<br />
53<br />
9<br />
27<br />
27<br />
23<br />
57<br />
73<br />
5<br />
13<br />
22<br />
Waseca<br />
Waseca Steele<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 7<br />
2151 Bassett Drive<br />
(507) 304-6100<br />
District Engineer: James Swanson<br />
Project Manager: Craig Felber<br />
Original date of Posting: Jan 2009<br />
Revised Date: 1/15/2011<br />
4<br />
51<br />
15<br />
20<br />
10<br />
5<br />
56<br />
56<br />
14<br />
16<br />
63<br />
18<br />
4<br />
18<br />
4<br />
29<br />
33<br />
32<br />
7<br />
112<br />
162<br />
18<br />
Page F4<br />