Schedule:<br />
Environmental Document Approval Date: Needed<br />
Municipal Consent Approval Date: Need Unknown<br />
Geometric Layout Approval Date: Need Unknown<br />
Construction Limits Established Date: Need Unknown<br />
Original Letting Date: 3/23/2012<br />
Current Letting Date: 3/23/2012<br />
Construction Season: 2012<br />
Estimated Substantial Completion:<br />
Project History:<br />
This is a pavement preservation Project.<br />
Project Benefits:<br />
To provide a smooth ride.<br />
Project Risks:<br />
PROJECT SUMMARY<br />
Hwy. 60\169<br />
From CO Rd 115 (Cray Corner) to Northstar Bridge in Mankato<br />
<strong>State</strong> Project No. 0708-35<br />
Annual Report on Major Highway Projects<br />
<strong>Minnesota</strong> Department of Transportation<br />
Project Description:<br />
Mill and Overlay from CO Rd 115 (Cray<br />
Corner) to Northstar Bridge in Mankato<br />
Recent Changes and Updates:<br />
Key Cost Estimate Assumptions:<br />
?ÜA@<br />
¹<br />
)o<br />
?ÜA@<br />
)y<br />
Total Project Cost Estimate (millions)<br />
Date in which the project entered into the STIP: 12/21/2010<br />
Baseline Est. Current Est.<br />
Construction Letting: $ 7.2<br />
$ 7.2<br />
Other Construction Elements: $ 1.3<br />
$ 1.3<br />
Engineering: $ 1.7<br />
$ 1.7<br />
Right of Way: $ 0.0<br />
$ 0.0<br />
Total: $ 10.2 $ 10.2<br />
)y<br />
)y<br />
North Mankato<br />
!(<br />
!P<br />
Mankato<br />
)y<br />
?áA@<br />
!( Skyline<br />
Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />
OCPPM.<br />
<strong>Minnesota</strong> Department of Transportation<br />
District 7<br />
2151 Bassett Drive<br />
(507) 304-6100<br />
District Engineer: James Swanson<br />
Project Manager: Peter Harff<br />
Original date of Posting: Jan 2011<br />
Revised Date: 1/15/2011<br />
Page F11