Schedule:<br />

Environmental Document Approval Date: Needed<br />

Municipal Consent Approval Date: Need Unknown<br />

Geometric Layout Approval Date: Need Unknown<br />

Construction Limits Established Date: Need Unknown<br />

Original Letting Date: 3/23/2012<br />

Current Letting Date: 3/23/2012<br />

Construction Season: 2012<br />

Estimated Substantial Completion:<br />

Project History:<br />

This is a pavement preservation Project.<br />

Project Benefits:<br />

To provide a smooth ride.<br />

Project Risks:<br />

PROJECT SUMMARY<br />

Hwy. 60\169<br />

From CO Rd 115 (Cray Corner) to Northstar Bridge in Mankato<br />

<strong>State</strong> Project No. 0708-35<br />

Annual Report on Major Highway Projects<br />

<strong>Minnesota</strong> Department of Transportation<br />

Project Description:<br />

Mill and Overlay from CO Rd 115 (Cray<br />

Corner) to Northstar Bridge in Mankato<br />

Recent Changes and Updates:<br />

Key Cost Estimate Assumptions:<br />

?ÜA@<br />

¹<br />

)o<br />

?ÜA@<br />

)y<br />

Total Project Cost Estimate (millions)<br />

Date in which the project entered into the STIP: 12/21/2010<br />

Baseline Est. Current Est.<br />

Construction Letting: $ 7.2<br />

$ 7.2<br />

Other Construction Elements: $ 1.3<br />

$ 1.3<br />

Engineering: $ 1.7<br />

$ 1.7<br />

Right of Way: $ 0.0<br />

$ 0.0<br />

Total: $ 10.2 $ 10.2<br />

)y<br />

)y<br />

North Mankato<br />

!(<br />

!P<br />

Mankato<br />

)y<br />

?áA@<br />

!( Skyline<br />

Construction cost estimates are adjusted to the mid-year of construction, using inflation rates provided by<br />

OCPPM.<br />

<strong>Minnesota</strong> Department of Transportation<br />

District 7<br />

2151 Bassett Drive<br />

(507) 304-6100<br />

District Engineer: James Swanson<br />

Project Manager: Peter Harff<br />

Original date of Posting: Jan 2011<br />

Revised Date: 1/15/2011<br />