16.10.2013 Views

Stand-Alone Punch machine user manual - Finn-Power International ...

Stand-Alone Punch machine user manual - Finn-Power International ...

Stand-Alone Punch machine user manual - Finn-Power International ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10 ORDERS MANAGEMENT SYSTEM (MRP Nesting)<br />

The Orders Management System (OMS) is a feature within NC Express that allows a<br />

<strong>user</strong> to process production requirements in a more accurate and efficient manner.<br />

OMS (Orders Database) can be used to nest parts from text file created that contains<br />

all the part information to be nested. By having an order file of parts, the file can be<br />

imported into the Orders Database to be nested instead of <strong>manual</strong>ly adding each part<br />

to the nest dialog each time a nest needs to be created for an order. Once an order is<br />

imported and ran from the OMS run folders pertaining to material type and<br />

thicknesses are created automatically. This also allows integration with an MRP<br />

system to achieve more accurate and efficient nesting of parts.<br />

The following section will explore the Database Orders dialog as well as how to<br />

operate.<br />

10.1 Database Orders Dialog<br />

Go to Database menu | select Orders. The Database Orders dialog will be displayed.<br />

Tab Selection<br />

Active Tab: Displays ordered parts as well as unfinished parts ordered. If<br />

parts were not completely nested the remaining orders will stay in the active<br />

side until nested.<br />

Completed Tab: Once ordered parts are nested they will need to be<br />

optimized and post processed in order to be ‘completed’. After the parts are<br />

optimized and post processed the nests will need to be Accepted through the<br />

Nest Explorer. The acceptance will move parts that are active to the<br />

‘Completed’ tab.<br />

Sorting<br />

Machine combo-box: Allows <strong>user</strong> to select the <strong>machine</strong> that will be used. By<br />

selecting the <strong>machine</strong> from the Machine combo-box, orders for the selected<br />

<strong>machine</strong>, active or completed, will be displayed in either the Active or<br />

Completed grid.<br />

Sort by:<br />

10-122

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!