elined under the first contract. In <strong>2009</strong>/<strong>2010</strong> a second CCTV contract was awarded and has just<br />

commenced. This contract will assess approximately 34 kilometres of reticulation mains for rehabilitation as<br />

required.<br />

Approximately 2,800 metres of reticulation mains and 900 metres of carrier mains were added to the network<br />

with the new development at Pitt Town.<br />

In an endeavour to ensure that the sewer reticulation system remains operational at all times, a system of<br />

backup safety measures have been introduced on an ongoing basis.<br />

In <strong>2009</strong>/<strong>2010</strong> a sum of $130,535 was spent on general maintenance.<br />

Page 98<br />

<strong>2009</strong>/<strong>2010</strong> <strong>Annual</strong> <strong>Report</strong>