Item<br />
Kerb and Gutter Reconstruction<br />
at Various Locations.<br />
Clear drainage channels, pipes<br />
and pits<br />
Administration Building Windsor,<br />
Cable Locator<br />
Administration Building Windsor,<br />
Roof ladder hatch modifications<br />
Replacement Data Cables<br />
Glossodia Community Centre –<br />
Vinyl floor kitchen<br />
Maraylya Community Hall –<br />
Mesh Gutter Guard<br />
North Richmond Pre-School –<br />
Replace Kitchen<br />
Comment<br />
sealed. The outcome includes uninterrupted access to private<br />
properties due to deep channel erosion, reduced maintenance<br />
expenditure at these locations, improved parking, safer road network<br />
and a positive outcome for the community. A total amount of $150,000<br />
was expended on this Program.<br />
An amount of $12,797 has been expended on this program which<br />
represents approximately 100 lineal metres of reconstructed kerb &<br />
gutter. This work would not have been possible without the additional<br />
funding and provides for a much safer road network with improved<br />
drainage. <strong>Council</strong>’s exposure to potential litigation resulting from trips<br />
and falls is also reduced.<br />
The additional funds of $67,203 enabled many additional drainage<br />
channels, pipes and pits to be cleared thus preventing localised<br />
flooding during heavy rainfall.<br />
$7,000 was expended on the purchase of new equipment, enabling<br />
utility services to be located underground.<br />
Roof ladder hatch modifications were undertaken in the amount of<br />
$15,000, in accordance with new safety requirements.<br />
The amount of $12,000 enabled an upgrade of the data cabling<br />
between the Administration Building and Deerubbin Centre, to improve<br />
the speed of the IT network.<br />
The vinyl floor in the kitchen area was replaced, in the amount of<br />
$3,500.<br />
This project was undertaken in an effort to improve the water quality of<br />
the roof water entering the rain water tank. The project cost was<br />
$3,000.<br />
Replacement of the existing kitchen facility within the pre-school, in the<br />
amount of $16,000.<br />