23.01.2014 Views

Hedging Strategy and Electricity Contract Engineering - IFOR

Hedging Strategy and Electricity Contract Engineering - IFOR

Hedging Strategy and Electricity Contract Engineering - IFOR

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7.6 Summary 189<br />

We have quantified the value of the stored water <strong>and</strong> it turns out that this hedging<br />

value can be substantial. The hedging value however depends on the risk<br />

constraint <strong>and</strong> on the contract portfolio. To utilize the hedging potential in the<br />

hydro storage plants one needs to identify high margin contracts that from a<br />

risk perspective can be managed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!