• System installation i.e.<br />
application;<br />
• System performance trial<br />
section (if required);<br />
• Certification;<br />
• Monitoring.<br />
1. Data assessment: The<br />
applicant’s data, which should<br />
include general information on the<br />
product, the product’s track<br />
record, available test data,<br />
process quality control, and the<br />
specific intended use of the<br />
product, forms the basis of the<br />
subsequent assessment if found to<br />
be acceptable.<br />
2. Production control: It is a<br />
requirement of Agrément South<br />
Africa that an approved and<br />
documented quality system, based<br />
on the requirements of ISO 9000,<br />
be in place to control both the<br />
manufacture of constituents and<br />
the application process of the thin<br />
bituminous surfacing system.<br />
3. Laboratory testing: Testing<br />
will be carried out, where<br />
necessary, to determine or<br />
confirm characteristics of materials<br />
and to gauge aspects of<br />
performance.<br />
Characteristics of materials are<br />
determined to confirm that<br />
materials submitted for evaluation<br />
fall within the agreed or specified<br />
ranges; test values are also used<br />
for subsequent quality monitoring<br />
purposes.<br />
4. System installation: System<br />
installation will be witnessed to<br />
help gauge the effectiveness of<br />
the quality system and the<br />
procedures for the application of<br />
the UTFC. Road tests will be<br />
carried out and relevant samples<br />
taken for laboratory testing in<br />
accordance with the test methods<br />
and procedures detailed in the<br />
approved guideline document.<br />
These guidelines also lay down,<br />
where applicable, required<br />
performance levels.<br />
Required levels of performance<br />
take into account the certification<br />
classification category and traffic<br />
loads for which the system is<br />
intended.<br />
5. System performance: A trial<br />
is required to assess the<br />
performance of the system over a<br />
period of time, and site<br />
performance tests will include:<br />
• Visual observation;<br />
• Texture depth;<br />
• Skid resistance;<br />
• Torque bond.<br />
Additional tests may be required<br />
depending on whether<br />
performance characteristics are<br />
claimed which are not covered by<br />
the above mentioned tests.<br />
6. Certification: Subject to a<br />
favourable assessment, Agrément<br />
South Africa will issue an<br />
Agrément certificate which will:<br />
• clearly define the system and<br />
state the uses for which the<br />
system has been assessed;<br />
• verify the system’s<br />
compliance with the Board’s<br />
performance criteria.<br />
The certificate will also clearly<br />
indicate conditions of certification<br />
and the Board may, at its<br />
167