27.07.2014 Views

Report - London Borough of Hillingdon

Report - London Borough of Hillingdon

Report - London Borough of Hillingdon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

APPENDIX A<br />

That action on achieving targets has started<br />

The Equality Standard Level 4: Information Systems and Monitoring against<br />

Targets<br />

An authority will need to demonstrate:<br />

That it has developed information and monitoring systems that allow it to assess<br />

progress in achieving targets<br />

It is measuring progress against targets and effectively information and<br />

monitoring systems.<br />

Monitoring reports are being produced at specified intervals and circulated to<br />

designated consultation and scrutiny groups.<br />

Monitoring systems are providing useful information about progress towards<br />

specific targets<br />

The Equality Standard Level 5: Achieving and Reviewing Outcomes<br />

An authority will need to demonstrate:<br />

It has achieved progress towards the targets set at level 3<br />

It has reviewed and revised targets monitoring and consultation systems.<br />

It has initiated a new round <strong>of</strong> action planning and target setting<br />

Through its achievement it can be seen as an example <strong>of</strong> good practice for<br />

other local authorities and agencies.<br />

3. LEVEL 2 EQUALITY STANDARD – Where we are at the moment<br />

It puts together in one place both the action items under corporate<br />

commitment and service level action to avoid duplication.<br />

LEADERSHIP ACTION PROGRESS<br />

• Published in variety<br />

<strong>of</strong> formats<br />

• Co-ordinated with<br />

R E S (Race<br />

Equality Scheme)<br />

1.1 Publish corporate<br />

equality and<br />

diversity plan<br />

(CEDP)<br />

• Plan going to<br />

Cabinet for<br />

publication in<br />

Oct 05<br />

• RES on web –<br />

incorporates<br />

action plans<br />

from the CEDP<br />

PART 1 – MEMBERS, PUBLIC AND PRESS<br />

Cabinet report 10 th November 2005 Page 146

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!