5. Utilities<br />

The access road corridor also contains the utility connections to the Pier. A request to<br />

the <strong>City</strong> will be formulated to ascertain the sizes and capacities <strong>of</strong> the utilities. Groundlevel<br />

utility boxes are in evidence and need to be placed on the project topographic and<br />

utility survey. Utilities include:<br />

Water: There is an above ground valve assembly, painted blue, just west <strong>of</strong> the Pier<br />

header. This assembly may also contain an RPZ device. The water line later divides<br />

into several branches which are observable on the Pier. See Photo 6.<br />

Photo 6: Water supply valve assembly west <strong>of</strong> bulkhead