Mark Apaliski<br />
Preconstruction<br />
Personal <strong>St</strong>ats<br />
35 years in the industry<br />
Polytechnic Institute and <strong>St</strong>ate<br />
University<br />
B.S., Civil Engineering, Virginia<br />
Highlighted Projects<br />
Role and Expertise<br />
Mark has extensive experience in preconstruction activities for marine<br />
work, including wharfs, piers, and tunnels; interchanges, highways, and<br />
bridges, including bridges over water; and industrial plant expansions<br />
and renovations. As Mark is responsible for:<br />
••<br />
Review <strong>of</strong> scope <strong>of</strong> work and selection <strong>of</strong> cost effective construction<br />
methods used in bids and proposals<br />
••<br />
Bid preparation/cost modeling for lump sum, cost plus and budget<br />
proposals<br />
••<br />
Review and adjudication <strong>of</strong> all estimates, including review with<br />
operations and executive management<br />
••<br />
Assist in preparation <strong>of</strong> cost analysis for jobsite cost control, cash<br />
flow and manpower projections, and detailed schedules.<br />
“<br />
I find it rewarding to identify project challenges,<br />
develop creative solutions, and then see them through to<br />
a successful completion. I look forward to working with<br />
this team on this exciting, iconic project in the heart <strong>of</strong> <strong>St</strong>.<br />
Pete.<br />
” Additional Projects<br />
••<br />
VDOT’s Midtown Tunnel PPP project ($1.4 billion)<br />
••<br />
District DOT’s 11th <strong>St</strong>. Bridge ($260 million)<br />
••<br />
DelDOT’s Indian River Bridge ($150 million)<br />
••<br />
VDOT’s Pinners Point Interchange, featuring six major bridges,<br />
including one 3,300 foot long bridge over water ($155 million)<br />
SCDOT Cooper River Bridge<br />
Charleston, SC<br />
$215 million. Skanska was awarded a designbuild<br />
contract to construct a 2.5-mile bridge<br />
over the Cooper River from I-26 in Charleston<br />
to Coleman Boulevard in Mount Pleasant. The<br />
project, completed one year ahead <strong>of</strong> schedule,<br />
was a fast tracked with a total duration <strong>of</strong> 48<br />
months for design and construction. Skanska<br />
was the managing partner <strong>of</strong> a joint venture.<br />
FDOT I-10 Escambia Bay Bridges<br />
Pensacola, FL<br />
$164 million, Skanska was awarded a designbuild<br />
contract to replace the I-10 bridges,<br />
which had been severely damaged by Hurricane<br />
Ivan. Skanska was the managing partner <strong>of</strong> a<br />
joint venture. The two replacement bridges are<br />
approximately 2.5 miles long and have three 12-<br />
foot travel lanes with 10-foot inside and outside<br />
shoulders. The bridges are founded on 140,000<br />
feet <strong>of</strong> 36-inch, voided, square, prestressed<br />
concrete piles.<br />
958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />
A. Experience and Qualifications<br />
Page 33