Mark Apaliski<br />

Preconstruction<br />

Personal <strong>St</strong>ats<br />

35 years in the industry<br />

Polytechnic Institute and <strong>St</strong>ate<br />

University<br />

B.S., Civil Engineering, Virginia<br />

Highlighted Projects<br />

Role and Expertise<br />

Mark has extensive experience in preconstruction activities for marine<br />

work, including wharfs, piers, and tunnels; interchanges, highways, and<br />

bridges, including bridges over water; and industrial plant expansions<br />

and renovations. As Mark is responsible for:<br />

••<br />

Review <strong>of</strong> scope <strong>of</strong> work and selection <strong>of</strong> cost effective construction<br />

methods used in bids and proposals<br />

••<br />

Bid preparation/cost modeling for lump sum, cost plus and budget<br />

proposals<br />

••<br />

Review and adjudication <strong>of</strong> all estimates, including review with<br />

operations and executive management<br />

••<br />

Assist in preparation <strong>of</strong> cost analysis for jobsite cost control, cash<br />

flow and manpower projections, and detailed schedules.<br />

“<br />

I find it rewarding to identify project challenges,<br />

develop creative solutions, and then see them through to<br />

a successful completion. I look forward to working with<br />

this team on this exciting, iconic project in the heart <strong>of</strong> <strong>St</strong>.<br />

Pete.<br />

” Additional Projects<br />

••<br />

VDOT’s Midtown Tunnel PPP project ($1.4 billion)<br />

••<br />

District DOT’s 11th <strong>St</strong>. Bridge ($260 million)<br />

••<br />

DelDOT’s Indian River Bridge ($150 million)<br />

••<br />

VDOT’s Pinners Point Interchange, featuring six major bridges,<br />

including one 3,300 foot long bridge over water ($155 million)<br />

SCDOT Cooper River Bridge<br />

Charleston, SC<br />

$215 million. Skanska was awarded a designbuild<br />

contract to construct a 2.5-mile bridge<br />

over the Cooper River from I-26 in Charleston<br />

to Coleman Boulevard in Mount Pleasant. The<br />

project, completed one year ahead <strong>of</strong> schedule,<br />

was a fast tracked with a total duration <strong>of</strong> 48<br />

months for design and construction. Skanska<br />

was the managing partner <strong>of</strong> a joint venture.<br />

FDOT I-10 Escambia Bay Bridges<br />

Pensacola, FL<br />

$164 million, Skanska was awarded a designbuild<br />

contract to replace the I-10 bridges,<br />

which had been severely damaged by Hurricane<br />

Ivan. Skanska was the managing partner <strong>of</strong> a<br />

joint venture. The two replacement bridges are<br />

approximately 2.5 miles long and have three 12-<br />

foot travel lanes with 10-foot inside and outside<br />

shoulders. The bridges are founded on 140,000<br />

feet <strong>of</strong> 36-inch, voided, square, prestressed<br />

concrete piles.<br />

958-26 CMAR with GMP for the Municipal Pier Replacement Project<br />

A. Experience and Qualifications<br />

Page 33